3M Flashcards
All feedback reports requesting change in maintenance responsibilities must be signed by who?
XO
What instruction dictates the requirements for HAZMAT container labeling?
OPNAVINST 5100.19
When can a MIP not applicable to a work center be deleted?
When a Feed Back Report is approved for deletion of MIP
What PQS requires the 301 Craftsman as a pre-requisite?
303 DCPO
What are five exapmles of PPE?
Gloves, face shield, goggles, hearing protection, boots
What is the definition of Status I Inactive Equipment Maintenance (IEM)?
Equipment that will remain on board and will be inactive for 30 days of longer and is not scheduled for corrective maintenance or overhaul
What is the objective of the ship’s #M Preventive Maintenance System (PMS)?
Maintain equipment within specifications through preventive maintenance
How much time does the 3MC have prior to sending out FBR?
4 days
When a FBR is received, safety related PMS updates are required to be implemented?
Within 2 to 5 working days of receipt
What is an ACN?
Advance Change Notice
The ship should _____ when IEM requirements are not justified.
Consider all factors that affect equipment deterioration and take precautionary measures
What must HAZMAT container contain?
As much information as applicable (name, manufacture, stock number, precautions, handling procedures, storage procedures)
What does a circles maintenance requirement on the Quarterly Board signify?
Not Fully Accomplished
Who is overall responsible for the 3M program?
XO
A flip page entry must be made for on the Accountability Sheet for the following PMS checks:
Out of periodicity, rescheduled, deleted, accomplished by a higher authority