3M Flashcards

1
Q

All feedback reports requesting change in maintenance responsibilities must be signed by who?

A

XO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What instruction dictates the requirements for HAZMAT container labeling?

A

OPNAVINST 5100.19

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When can a MIP not applicable to a work center be deleted?

A

When a Feed Back Report is approved for deletion of MIP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What PQS requires the 301 Craftsman as a pre-requisite?

A

303 DCPO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are five exapmles of PPE?

A

Gloves, face shield, goggles, hearing protection, boots

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the definition of Status I Inactive Equipment Maintenance (IEM)?

A

Equipment that will remain on board and will be inactive for 30 days of longer and is not scheduled for corrective maintenance or overhaul

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the objective of the ship’s #M Preventive Maintenance System (PMS)?

A

Maintain equipment within specifications through preventive maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How much time does the 3MC have prior to sending out FBR?

A

4 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When a FBR is received, safety related PMS updates are required to be implemented?

A

Within 2 to 5 working days of receipt

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is an ACN?

A

Advance Change Notice

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The ship should _____ when IEM requirements are not justified.

A

Consider all factors that affect equipment deterioration and take precautionary measures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What must HAZMAT container contain?

A

As much information as applicable (name, manufacture, stock number, precautions, handling procedures, storage procedures)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What does a circles maintenance requirement on the Quarterly Board signify?

A

Not Fully Accomplished

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Who is overall responsible for the 3M program?

A

XO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

A flip page entry must be made for on the Accountability Sheet for the following PMS checks:

A

Out of periodicity, rescheduled, deleted, accomplished by a higher authority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When conducting an Equipment Validation and the Manufacture Serial Number is blank, what is used to identify the equipment?

A

PRID - Positional Reference Identification

17
Q

When does the Maintenance Person performing PMS sign for accomplishment?

A

After completion of the maintenance

18
Q

Who ensures that the ship’s 3M program id functional and meets the required standard to meet the mission?

A

CO

19
Q

A maintenance man will be given no more than ___ hours to gather required PMS materials to demonstrate the PMS spot check.

A

2 hours

20
Q

At the end of a PMS week, who is required to review Sked accountability log for completeness and accuracy?

A

WCS, LCPO, DIVO

21
Q

What is the intent of a spot check?

A

Ensure the maintenance was completed and correctly performed.

22
Q

When preparing Equipment Guide Lists (EGL) what must be taken into account?

A

Have no more than a single days worth of work

23
Q

When is an Equipment Guide List required?

A

When a controlling MRC applies to a number of identical items

24
Q

How many days can a work candidate be in the OMMS Review and Approval queue?

A

7 days

25
Q

What is the time line goal of equipment validations on board in regards to equipment and PMS assignments?

A

5 years

26
Q

The 3M System Coordinator serves as which of the following?

A

Serve as the principal 3M assistant to the XO

Functional Manager