303 - Workcenter Supervisor Flashcards
Which form is used for documenting installation of new equipment?
OPNAV Form 4790/CK.
What is NAVSEAINST 4790.8 (Series)?
Ship’s Maintenance and Material Management Manual.
Who is the 3-M system functional manager within the Command?
The 3-M Coordinator.
What form is used to report discrepancies/deficiencies in the PMS system?
OPNAV 4790/7B (FBR).
What is OPNAVINST 5100.19 (Series)?
Navy Safety and Occupational Health (SOH) Program Manual for Forces Afloat.
How often should PMS check 6641/005 M-9R be accomplished?
Once a month or as required.
When would equipment be operated with a red tag attached?
Never.
Equipment should be placed in IEM Status II when…
Equipment is not going to be used for 7 days or more and is scheduled for overhaul.
Danger and Caution Tag out Audits are conducted how often?
Weekly.
What does an “C” beside a MIP number on the LOEP mean?
A change to the MIP.
A work center can take credit for a PMS check if 80% of the check can be completed?
False.
How often will the PMS check 4211/001 Q-6R have to be accomplished?
Once per Quarter, or as required.
A Caution Tag is used whenever?
Operation of equipment that can endanger equipment, systems, and/or components.
The Maintenance Data System (MDS) is the means in which work center supervisors can?
Generate a request for assistance outside of the command, Report corrective maintenance actions and equipment condition and Report the installation of a new configuration change.
Who has overall responsibility for ensuring the 3-M system functions within the command?
The Commanding Officer.
An OPNAV 4790/CK is used to report identified material discrepancies/deficiencies.
False.
To request a replacement for a lost or damaged MRC that is classified, the Work Center Supervisor should fill out a?
OPNAV 4790/7B (PMS FBR Non-Technical).
An MRC card with SYSCOM MRC Control Number A7 4ABG N has a production (birth) date of?
October 2007.
Which of the following is NOT an example of an IEM MRC?
U-1
Equipment is placed in IEM Status I whenever?
The equipment will not be operated for 7 days or more.
Which Tag-Out Log would a Supply Department DCPO use to accomplish a DC related tag-out?
Engineering Tag-out Log.
Which document provides instructions and references required for use in the 3M System?
OPNAVINST 4790.4(series).
In SKED or on the 13 Week Report, M-1(#R-1) signifies what?
Monthly one has mandatory related maintenance of R-1.
“S 24 DWYG N” From this MRC SYSCOM CONTROL NO you know that the MRC is:
Classified secret.