301 Question Bank 3 Flashcards
What system is used to track corrective maintenance?
OMMS-NG
What manual covers all things Hazmat related
NSTM 670
What manual is used for Tag-out procedures
Tag-out Users Manual
TUM
What is the HMUG
Hazardous Materials Users Guide
What is/are responsibilities of the maintenance person?
Perform assigned scheduled maintenance
Who is responsible for effective operation of 3M within their work center?
LCPO
Who is responsible for effective operation of 3M within their division?
DIVO
Who conducts an oral board for 3M 301
D3MA
Who assigns spot checks within the department
D3MA
Who assigns zone inspectors within the department?
D3MA
What is another name for LOEP
PMS-5
What does the letter ‘C’ or ‘A’ to the left of the MIPS on the LOEP indicate?
It indicates Change or Addition to MIP respectively
What does MIP stand for?
Maintenance Index Page
Whad do the last tow numbers on the SYSCOM MIP contorl number represent
Month and Year MIP was prepared
What is the purpose of the MRC
provide step-by-step procedures to effectively perform PMS
4FCD in SYSCOM Control Number B4 4FCD Y indicates waht?
The library code
How long is 0.1 man-hours?
6 minutes
How long is 1.1 man-hours
1 hour and 6 minutes
What do you do once you have completed a PMS check?
Notify WCS, report any discrepancies and sign if off in SKED0
An ‘X’ on the Quarterly schedule means
Action fully accomplished
You are performing a maintenance action and cannot complete a step on the procedures, what if any is the most correct statement for reporting status of maintenance action?
Stop the PMS and notify WCS for clarification
If you discover inaccurate data on an MRC you should?
-Inform your WCS of the discrepancy
-Submit a PMS Feedback Report
Classified MRCs are printed on what color paper?
Pink paper
Common safety charpters when conducting maintenance: B12
PPE
Common safety chapters when conducting maintenance: B7/C9
Electrical/Electronic safety
When is the double-barrier isolation required for electrical systems?
Breakers with remote operating capabilities shall be tagged both at the breaker and at all remote operating stations
When is the double-barrier isolation required for mechanical systems?
- high temperature; 200F or more
- High pressure 1000 psi or greater
- All sea connected systems except lines less than 1/3 inch inboard of the backup valves
- All hull penetrations below the anticipated waterline
- Fluids with flash point below 200F
- Oxygen
- Hazardous toxic vapor
What is in the LIRs?
- Information required for isolating equipment
- list of required tags and verifying signatures
List the sections of the Tag out Log
- Tag-out Index
- Record of Audits
- TORSs (active and cleared)
- Instrument Log
What symbol indicates a checknote
Blue folder with a red cross
What symbol indicates a Safety of Ship item?
*
What periodicity is 2W
Every 2nd week
What periodicity is 3W
Every 3rd week
On which PMS schedule would you find “2D” listed?
Weekly
What is periodicity is M-2
Monthly
What does the “R” stand for in M-1R
Situation code
Who can initiate a FBR
Anyone within the chain of command
Which category of IEM is accomplished when placing an equipment in IEM
Lay-up Maintenance
Which category of IEM is accomplished on a recurring basis during the inactive period to prevent equipment deterioration?
Periodic Maintenance