Recoleccion de informacion de productos, procesos e itineratios

A

1)FP- diseño de productos/procesos/itinerarios

*Para FP necesitamos
Que, como , cuando, cuanto, donde y por cuanto tiempo produciremos?

->Para obtener esta informacion necesitaremos insumo de :Product designers, process planners y production planner (MRP)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Product designers

A

-Especifican como es el producto en terminos de dimensiones, material y alguna vez empaque

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Process planners

A

-Especifican el proceso de produccion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Production planners

A

-Especifican cantidades e itinerario de produccion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Relationship between product, process and schedule

A

Product design

                     Facilities design

Process design Schedule design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Herramientas necesarias para diseñar un proceso

A

Lista parcial de herramientas de diseño:

1)Part Drawings
2)Process flowcharts and process maps
3)Make vs buy
4)parts list
5)BOM
6)Route sheets
7)Assembly charts
8)Operations process charts
9)Precedence Diagrams

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Process map/Process flow chart

A

*Flujograma de los procesos

Simbolos

1)Comienzo/fin= ovalo
2)proceso= rectangulo
3)Decision= diamante
4) Conector/ inspeccion = circulo
5) Espera (delay)= D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Swim Lane

A

*Carril de nado (Divide por departamento)

-Las diferentes personas o funciones en el proceso y pongalas a la izquierda o arriba en el diagrama

-tome el flowchart y ponga cada elemento en el swim lane apropiado

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Value Stream map

A
  • En Lean se usa para identificar desperdicios (muda)

-Se enfoca en procesos, incluyendo los suplidores y los clientes

-Se usan elementos diferentes que en los flujogramas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Tipos de Value stream map (VSM)

A

1)Current State Map
2)Future State map
3)Ideal state map

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Mapping Tips

A

1)Focus on one product or family
2)Walk entire value stream first
3) Begin with the shipping end and work upstream
4)Go back and gather information at each process
5)Always collect current state information while walking the actual pathways and flow
6)Verify all estimated or standard set up and cycle times (Stopwatch)
7)Always draw by hand

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Project charter parts

A

1)Problem statement
2)Objective statement
3)Scope
4)Primary metric
5)Secondary metric
6)Stakeholders
7)Team members

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Problem statement

A

What is the challenge?
How much it is affecting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Objective Statement

A

How much of an improvement is desired from the project? (Con metricas)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Scope

A

What are the boundaries of the project?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Primary Metric

A

The actual measure in the process

*Que y como se va a medir

17
Q

Secondary Metrics

A

Measures of potential consequences (+-) As a result of changes in the process

18
Q

Stake holders

A

Who will be affected?

*Project Champion, Project Lead, Project Sponsor

19
Q

Team members

A

Include sponsor, project champion, project manager, lead, team members

20
Q

Objective Statement

A

*Should directly address the information in the problem statement

*Indicate what level of improvement is expected for this project. Specific, quantifiable amount of improvement planned above

*Determine how long it will take to complete this project

*Estimate financial benefit of achieving expected level of improvement

21
Q

¿Cuanto producir?

A

*lot sizing

*Production schedule

22
Q

¿Hasta cuando?

A

Forecast

23
Q

Estimado de demanda

A

hasta 10 años

24
Q

Ley de Pareto

A

85% de las riquezas son del 15% de la poblacion.

*Se usa 80-20%

80% de las ganancias por 20% de los productos