17 Development / Project Briefs Flashcards

1
Q

What is the purpose of a development brief?

A

To stipulate interest in a site

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is typically found in a development brief?

A
  • Site analysis (development principles and an urban design framework)
  • Establish what a site should achieve for a given location
  • Include a masterplan (use classes, open spaces, access arrangements)
  • Varying levels of detail (depending how soon planning is)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When are development briefs written?

A

Prior to planning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What type of site usually needs a development brief?

A

Large / complex sites

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is an important step in development brief drafting?

A

Community consultation (more weight held to them)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the purpose of a project brief?

A

Prepared once the development brief has advanced

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Why do project briefs typically follow development briefs?

A

Enable design team to commence work on a scheme which won’t fundamentally change in nature

This also means they will be more in line with Local Plan policies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What do project briefs typically include?

A
  • Time, budget, quality expectations, key risks
  • Site info (surveys)
  • Client preferences / policies (performance requirements e.g. HQM)
  • Legal constraints (heritage / environmental / access)
  • Planning consents
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How do you negotiate agreements with stakeholders such as LPAs / adjacent site owners / purchasers?

A

LPAs:
- Pre-apps
- DRPs
- Community consultation

Adjacent site owners:
- Meetings
- Third party consultants like Kate Grant

Purchasers:
- Use the development and project briefs to inform them

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How do you plan the implementation of a scheme with contractors or the local authority?

A

LPAs:
- Pre-commencement conditions
- Pre-construction conditions
- Pre-occupation conditions

Contractors:
- Tender
- Site walks
- Briefs and appendices

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How do you derive indicators of success within a development or project brief?

A

Development brief:
- Minimum targets (GEA / unit number / efficiencies)

Project brief:
- HQM score

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Please explain what you included in the Plot Development Brief?

A
  • Use classes
  • Tenure
  • Market positioning
  • Massing parameters
  • Access and servicing arrangements
  • Open space
  • Programme of design and planning milestones
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What did you review to inform the Plot Development Brief and why was this important?

A
  • Reviewed consultation material following the masterplan consultation
  • To ensure the development brief captured any key principles or requirements that had arisen from it
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Please explain what you included in the Interior Design Project Brief?

A
  • Vision to reflect the industrial character of Silvertown through textures and colours
  • Annotated GA plans to show which parts were to be designed
  • List of deliverables, including CGIs, GA plans, and FF&E schedule
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Please explain what you included in the PEC Development Brief?

A
  • Key objective (to connect into the ectogrid)
  • Spatial and operational requirements
  • Optimal location based off proximity to factory and maximum building heights parameter plan
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What were the spatial and operational requirements of the PEC?

A

Spatial:
- 600 sqm
- 7.8 metres high

Operational:
- 2 loading bays for 3.5 tonne vehicles
- Access to electricity, water, drainage, telecomms, ectogrid pipework, connect to dock

17
Q

Please explain what you included in the Amenity Project Brief?

A
  • Reviewed masterplan consultation to understand whether the community had specified a desire for any amenities
  • They wanted convenience stores, healthcare provision and entertainment
  • My analysis shows a lack of gym and sports facilities
18
Q

What did you advise in the amenity brief?

A
  • Core amenities such as convenience stores, healthcare provision and gym should be delivered first in phase 1
  • Additional amenities such as cinema / water sports facilities should be delivered in later phases
19
Q

At what stage does a development brief happen?

20
Q

What is the difference between a development brief and a project brief?

21
Q

What sections would I expect to see in a development brief?

22
Q

Which members of the design team would input into the development brief?

23
Q

What is the internal process for approving a development brief?

24
Q

Why is it important to understand market trends in a development brief?

25
Q

In the plot development brief, how did you select use classes?

26
Q

In the plot development brief, how did you validate performance assumptions?

27
Q

In the interior design project brief, as this was a brief within a larger masterplan, how did you ensure it aligned with the overarching development brief?

28
Q

Why did you need an interior design brief?

29
Q

What use class was the interior design brief for?

30
Q

For the PEC development brief, how did this differ from a development brief for a residential development?

31
Q

For the PEC development brief, how did the development brief financially assess the PEC?

32
Q

For the PEC development brief, what other similar schemes are there in London?

33
Q

For the amenity brief, in addition to the community consultation, how else did you assess the amenities required for a new masterplan?

34
Q

For the amenity brief, how did you assess the benefit of these amenities to the masterplan?

35
Q

In your development and project brief level one, you didn’t mention planning or legal considerations? Did you also include a summary of these? Was the plot a part of a master plan, if so, what is an example of this?

36
Q

Which other consultants contribute to your development and project briefs?

37
Q

You mentioned a design code in your mini masterplan, is that not relevant in the plot configuration example too?

38
Q

Please can you explain what an ectogrid is, you say it is the most effective way to recycle energy - how does that work?