13. Water shuttle operations Flashcards
1
Q
In accordance with NFPA 1901, water tenders must be designed to be filled at a rate of at least ___ GPM.
A
1000 gpm
2
Q
A __ route is that optimum arrangement for a water shuttle circuit.
A
Circular
3
Q
$$$
Commonly, water tenders have at least __ 2 1/2 inch direct tank fill connections or one LDH direct tank fill connection on the rear of the apparatus.
A
2
4
Q
Any tank should be set up on a surface that is as level as possible and have a capacity at least __ gallons larger than the water tank on the apparatus that will supply it.
A
500 gallons
5
Q
The dump site pumper should utilize a low level strainer to allow for continuous drafting to a point of about __ inches.
A
2 inches