13. Water shuttle operations Flashcards

1
Q

In accordance with NFPA 1901, water tenders must be designed to be filled at a rate of at least ___ GPM.

A

1000 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A __ route is that optimum arrangement for a water shuttle circuit.

A

Circular

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

$$$

Commonly, water tenders have at least __ 2 1/2 inch direct tank fill connections or one LDH direct tank fill connection on the rear of the apparatus.

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Any tank should be set up on a surface that is as level as possible and have a capacity at least __ gallons larger than the water tank on the apparatus that will supply it.

A

500 gallons

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The dump site pumper should utilize a low level strainer to allow for continuous drafting to a point of about __ inches.

A

2 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly