A __ elevator may be the best available resource to gain access to the upper floors in a high-rise project.

A

Construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Newer building codes require that a minimum of one lighted stairway be provided when building construction reaches a height above ___

A

Four stories or 50 ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The most efficient method of providing fire protection on a construction project is to make use of the

A

Permanent fire protection systems as they are installed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

NFPA 241 requires the presence of a ___ rated extinguisher during roofing operations as a precaution against ignition of combustible materials

A

20 B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The primary hazard unique to renovation and remodeling is the disturbance of hazardous substances such as …

A

Asbestos

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

In newer buildings with sprinkler systems, building and fire codes require valves controlling the water supply for sprinkler systems with more than ___ sprinklers to be monitored at a constantly attended location

A

20

How well did you know this?
1
Not at all
2
3
4
5
Perfectly