1. Building construction and the fire service Flashcards
A _____ firm is usually a general contractor with architects and engineers on staff.
Design build
Finally modifications and design decisions are settled. At this time, the buildings details become more specific and involve everything within the scope of the final building.
Documentation and bids
A ____ is a body of law that determines the min standards that buildings must meet in the interest of community safety and health.
Building code
The most widely used building code in the United States is the…
International building code IBC
published by the way international code council ICC
_____ impose restrictions on designers that may conflict with their creative intentions.
Building codes
Type I
Fire resistive
Type II
Non combustible
Protected non combustible
Type III
Ordinary
Exterior protected
Type IV
Heavy timber
Type V
Wood frame
When a building encompasses multiple classifications, the building should be considered to meet the ____ construction classification.
Lesser
As a general rule, greater quantities of fuel or highly volatile fuels will generate a higher ____
Heat release rate
The total amount of heat produced or released to the atmosphere from the convective lift phase of a fire (BTUs)
American with disabilities act
1990
Areas of refuge
Must have two way communication
Distance from the street to the front of a building
Set back
$$$
Older neighborhoods sometimes undergo ____
Gentrification
Process of restoring rundown or deteriorated properties