1.12 Feasibility studies (key terms) Flashcards

1
Q

Lean manufacturing

A

The concept of reducing waste in manufacture. this can be waste in time or materials, or idle machines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Buffer zone

A

An area adjacent to a point on a production line for the temporary storage of partially completed products

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Cycle time

A

The time it takes for a manufacturing process to be completed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Takt time

A

A German word meaning ‘beat or rhythm’. it is used in lean manufacturing to describe the maximum amount of time in which a product must be produced to meet consumer demand

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Prototype

A

A functioning or non-functioning pre-production model that can be used to evaluate with potential consumers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly