Pros and cons of cast in place concrete

A

Pros:
1. strong compression
2. adaptable 9many forms)
3. lots of finishes and textures
4. rel low cost
5. fire resistant
6. thin assemblies
7. span can be increased with thickness/ reinforcement

cons:
1. weak in tension
2. very heavy
3. Labour intensive
4. good weather for pouring

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Pros and cons of masonry as a structural system

A

pros:
1. modular
2. fast erection
3. fire resistive
4. adaptive
5. good acoustic properties

cons:
1. short spans
2. proper detailing is time consuming (weep holes, expansion joints etc)
3. reinforcing required
4. skilled trades essential
5. thicker assemblies
6. not great insulator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Pros snd cons of Steel as a structural system

A

pros:
1. fast construction
2. weight to volume/ light dead load
3. strongest low cost material
4. very adaptable
5. long spans with relatively light material

cons:
1. difficult to work on site
2. galvanized when exposed to elements
3. requires fire protection
4. most efficient with regular grid
5. needs lateral support (shear, bracing, rigid framing)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Pros and cons of wood structural system

A

pro:
1. most economical
2. easy to construct / trades
3. flexible and lightweight
4. dimensional lumber and engineered systems available
5. no weather limitations

con:
1. thick floor assembly
2. combustible
3. spans/ ht limited
4. needs many trades
5. susceptible to rot decay insect damage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Structural info to be decided at DD

A
  1. typical framing layouts
  2. max depth of members
  3. size/ location of openings
  4. fire rating issues
  5. any special equipment
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

mech info to be decided at DD

A
  1. central vs individual heating/ cooling
  2. type/size of equipment
  3. size/location of major ducts
  4. confirm size/location of utility room
  5. any special features (noise dampers etc)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

elec info to be decided at DD

A
  1. anticipated load
  2. incoming services
  3. location of elec closet/ risers/ comm rooms
  4. embedding conduits
  5. fixtures, data systems etc
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

what is needed from consultants at CD

A
  1. detailed calcs
  2. plans/ details/ diagrams etc
  3. spec sections
  4. final construction cost estimate
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

list permanent dead loads:

A
  1. uniform
  2. concentrated
  3. distributed
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

6 static loads

A
  1. live
  2. dead
  3. ground pressure
  4. hydrostatic pressure
  5. ground pressure
  6. impact
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

heating/ cooling loads

A

heating load = heat lost
cooling load = heat gain

How well did you know this?
1
Not at all
2
3
4
5
Perfectly