062.07 PBN Flashcards

1
Q

RNAV procedures used during terminal phases are (…)​.

A

RNAV procedures used during terminal (= arr/dep) phases are (RNAV 5, RNAV 2, RNAV 1).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

PBN procedures used during oceanic phases are (…)​.

A

PBN procedures used during oceanic phases are (RNP 4 and RNP 2).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Vertical information for an LNAV/VNAV approach is provided by (GLS/radio altimeter/SBAS) or baro-VNAV.

A

Vertical information for an LNAV/VNAV approach is provided by (SBAS) or baro-VNAV.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

PBN procedures used during approach phases are (…)​.

A

PBN procedures used during approach phases are (RNP (AR) APCH).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A fixed radius path for an en-route section is named (RF/TMA/FRT) leg type.

A

A fixed radius path for an en-route section is named (FRT) leg type.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

PBN path terminator ‘TF’ means (…)​.

A

PBN path terminator ‘TF’ means (Track to Fix).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

In oceanic/remote, en-route and terminal phases of flight, PBN is limited to operations with (angular/linear)​ lateral performance requirements and time constraints.

A

In oceanic/remote, en-route and terminal phases of flight, PBN is limited to operations with (linear) lateral performance requirements and time constraints.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

PBN procedures used during en-route phases are (…)​.

A

PBN procedures used during en-route phases are (RNP 2).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

For PBN operations, the Total System Error (TSE) is the sum of three main contributing errors. State them:

A

For PBN operations, the Total System Error (TSE) is the sum of three main contributing errors. State them:

  • Path Definition Error (PDE)
  • Flight Technical Error (FTE)
  • Navigation System Error (NSE)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The name of a curved terminal or approach section, defined by fix, radius and arc length is a (…).

A

The name of a curved terminal or approach section, defined by fix, radius and arc length is a (fixed radius path).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

An error during PBN operations related to the execution of flight along the defined path refers to a (PDE/FTE/NSE)​.

A

An error during PBN operations related to the execution of flight along the defined path refers to a (FTE).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

PBN path terminator ‘DF’ means (…)​.

A

PBN path terminator ‘DF’ means (Direct to Fix).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

PBN path terminator ‘FA’ means (…)​.

A

PBN path terminator ‘FA’ means (Fix to an Altitude​).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

PBN path terminator ‘CA’ means (…)​.

A

PBN path terminator ‘CA’ means (Course to an Altitude).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

An error during PBN operations in the accuracy of determining actual aircraft coordinates refers to a (PDE/FTE/NSE)​.

A

An error during PBN operations in the accuracy of determining actual aircraft coordinates refers to a (NSE).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

PBN path terminator ‘IF’ means (…)​.

A

PBN path terminator ‘IF’ means (Initial Fix).

17
Q

RNAV procedures used during en-route phases are (…)​.

A

RNAV procedures used during en-route phases are (RNAV 5, RNAV 2 and RNAV 1).

18
Q

PBN path terminator ‘CF’ means (…)​.

A

PBN path terminator ‘CF’ means (Course to Fix).

19
Q

RNAV procedures used during oceanic phases are (…)​.

A

RNAV procedures used during oceanic phases are (RNAV 10).

20
Q

PBN procedures used during terminal phases are (…)​.

A

PBN procedures used during terminal (= arr/dep) phases are (RNP 1).

21
Q

An error during PBN operations rising from the RNAV system and its inability to accurately specify the desired path refers to a (PDE/FTE/NSE)​.

A

An error during PBN operations rising from the RNAV system and its inability to accurately specify the desired path refers to a (PDE).