05 - Fundamentals Of Production Systems Flashcards

0
Q

What are the two parts of the work preparation phase?

A

1) process planning

2) work system design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Name the 5 branches of production and point out their connection with a diagram!

A

Product design

  • > work planning
  • > production control
  • > manufacturing
  • > assembly
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Name two examples for each kind of planning tasks according to long-term, medium-term and short-term task!

A
Long-term:
1) material planning
2) process planing
Medium-term:
1) planning preparation 
2) cost planning
Short-term:
1) handle part list
2) NC-programming
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Production control is influenced by lots of various factors

A

1) product range
2) production type
3) stockage
4) product structure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Various task have to be fulfilled during the manufacturing and assembly process. Name 3 tasks for each of the two processes!

A
Manufacturing tasks:
1) tool change
2) processing
3) work piece change 
Assembly tasks:
1) joining 
2) handling 
3) adapt
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Name 3 advantages and disadvantages of the kanban system

A

+ low inventories
+ minimal control effort
+ reduction of throughput
- low buffers lead to a breakdown of all subsequent production processes in case of failures
- highly unsteady production volumes are not controllable
- low number of variants/high number standardized parts requied

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the advantages of the one-piece-flow? List 3 of them!

A

1) reduced throughput time
2) minimum stocks in the lines
3) visual management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

There are two completely different ways to organize production and to release production orders. Name them and assign Kanban and Heijunka to the right principle!

A

1) push principle: (Heijunka)
One control unit orders demands to each station individually
2) pull principle: (Kanban)
A production order is provided to the last step of the production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Describe the two steps of Heijunka!

A

1) leveling total production volume into daily volumes

2) smoothing out production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly