You got 37 of 40 possible points. Your score: 93 % Flashcards

1
Q

What does offer a great bandwidth of planning functionality with can be used in background jobs as well as interactive planning?
Please choose the correct answer.

Response:

Keypad PIN

Advanced Planning

Heuristics

Hardware token

A

Heuristics

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

In the standard version of Advanced Planning in SAPS/4HANA (e//PDS), where is a range of heuristics available for various tasks?
Please choose the correct answer.

Response:

In Production Planning and Detailed Scheduling.

Advanced Planning Product Master

the BADI implementation CUSLNTRTO_ADDIN

Production Planning orders

A

In Production Planning and Detailed Scheduling.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Most of the resource master data does not need any maintenance in the ePP/DS resource master.
Please choose the correct answer.

Response:

True

False

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the PP planning procedure in the product master describes?
Please choose the correct answer.

Response:

Hardening and reporting

Proper configuration of controls

That how a product is to be planned.

Healthy security posture

A

That how a product is to be planned.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Who are able to specify subitems so that you can specify different installation points, quantity required, and subitem text?
Please choose the correct answer.

Response:

Alert Monitor

Natural Disasters

BOM engineers

IP Infringement

A

BOM engineers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the material requirements which can be executed in SAP S/4HANA Digital Core ERP-PP or embedded PP/DS?
Please choose the correct answer.

Response:

CVSS version 3 also includes the requirements of privileges in its base metrics.

planning (MRP) and capacity planning (CRP).

Protecting accounts with passwords.

Protecting management interfaces and applications.

Disabling unnecessary accounts.

A

planning (MRP) and capacity planning (CRP).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the two options maintaining the available capacity for planning in Advanced Planning?
There are 2 correct answers to this question.

Response:

The available capacity with intervals and shift pattern is maintained entirely in SAP S/4HANA-ERP as ’external capacity’ for planning in Advance Planning or APO-PPDS. Maintaining Intervals of available capacity that are in PP/DS is not possible. To prevent data inconsistencies when you are also using the Fiori App Monitor Capacity Utilization the Capacity Variants, Shifts and Definitions are disabled in SAP GUI when External Capacity is selected for Resources

Social engineering conversation by a threat actor done in person or by phone, email, text, or instant messaging to obtain sensitive information from the user such as credentials, date of birth, account information, social security numbers, and so on.

You can maintain the available capacity in ePP/DS. Only the header data for the work center capacity is transferred from SAP S/4HANA Digital Core to PP/DS. Intervals of available capacity that exceed this overall capacity are maintained in ePP/DS

It seeks to identify issues in a network, application, database, or other IT systems prior to it being inadvertently or purposely used to compromise a system.

A

The available capacity with intervals and shift pattern is maintained entirely in SAP S/4HANA-ERP as ’external capacity’ for planning in Advance Planning or APO-PPDS. Maintaining Intervals of available capacity that are in PP/DS is not possible. To prevent data inconsistencies when you are also using the Fiori App Monitor Capacity Utilization the Capacity Variants, Shifts and Definitions are disabled in SAP GUI when External Capacity is selected for Resources

You can maintain the available capacity in ePP/DS. Only the header data for the work center capacity is transferred from SAP S/4HANA Digital Core to PP/DS. Intervals of available capacity that exceed this overall capacity are maintained in ePP/DS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How to ensure consistency of the availability dates and requirements dates between PP/DS and ERP on SAP S/4HANA?
Please choose the correct answer.

Response:

A bot on the computer is brute forcing passwords against a website

The end user purchased and installed a PUP from a web browser

Can indicate a serious impending situation

all components and items of a planned order should be integrated with ePP/DS for which the requirements dates and availability dates that have been planned using detailed scheduling are required based on the dates of the assigned operations.

A

all components and items of a planned order should be integrated with ePP/DS for which the requirements dates and availability dates that have been planned using detailed scheduling are required based on the dates of the assigned operations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What can be used as exclusive requirements sources (make-to-order production), or, together with planned independent requirements, they can create the total requirement?
Please choose the correct answer.

Response:

Repudiation

Threat modeling

Sales orders

SQL injection

A

Sales orders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How can you use the Alert Monitor to monitor production planning in PP/DS?
Please choose the correct answer.

Response:

we must define an alert profile for the application.

transformations return pointers to new RDDs.

where the argument to the for each method is an expression for an anonymous function.

allows you to write quick throw away functions without naming them

A

we must define an alert profile for the application.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which of the following activity is performed as a Quality Engineer?
Please choose the correct answer.

Response:

access to historical data which exhibits known customer behavior and knowing what problem we are trying to solve

Instant access to reliable infrastructure and tools to explore data, prototype advanced analytics algorithms, and curate visual reports without building anything themselves or wait for someone else to do it for them.

choose single inspection units (serial numbers) of an inspection lot on the usage decision details page and selectively post them to different stocks, such as, unrestricted use, scrap, sample, blocked, new material, or reserves.

Because it can do many types of workloads, you don’t mean various tools for managing each.

A

choose single inspection units (serial numbers) of an inspection lot on the usage decision details page and selectively post them to different stocks, such as, unrestricted use, scrap, sample, blocked, new material, or reserves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What does organize the material flow through all BOM levels, from the procurement of components and raw materials to delivery of a sales order?
Please choose the correct answer.

Response:

Heuristic

Pegging

Accelerate ETL

Text Extracting

A

Pegging

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

In SAP S/4HANA, which type of MRP run has to be scheduled for SAP S/4HANA-ERP and Advanced Planning Materials?
Please choose the correct answer.

SMS text

Only single

Tcpdump

Privacy

A

Only single

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The selection guide offers the following new planning strategies. what are they?
There are 3 correct answers to this question.

Response:

Strategies for Make-to-Stock Production

Strategies for Make-to-Order Production

Strategies for Planning Components

Planning strategies

A

Correct
Strategies for Make-to-Stock Production

Correct
Strategies for Make-to-Order Production

Correct
Strategies for Planning Components

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the following activities you can do as a Production Engineer in the Discrete Manufacturing Industry?
There are 3 correct answers to this question.

Response:

can navigate to all the relevant apps to display work centers,

create work centers, change work centers, replace existing values in work centers and check usage of work centers

navigate to mass maintenance of work center capacities for creating or updating of intervals and shifts and to edit the capacities.

applying this to your strategies will enable them to detect changes in customer behavior as they occur and act on them immediately

A

What are the following activities you can do as a
can navigate to all the relevant apps to display work centers,

create work centers, change work centers, replace existing values in work centers and check usage of work centers

navigate to mass maintenance of work center capacities for creating or updating of intervals and shifts and to edit the capacities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Planned order in ERP on SAP S/4HANA contain the all dependent requirements for:
Please choose the correct answer.

Response:

describes an approach, philosophy, or strategy regarding security

both Advanced Planning and non-Advanced Planning components.

Implementing a group policy to block user access to system files

Monitoring large data transfer transactions in the firewall logs

A

both Advanced Planning and non-Advanced Planning components.

17
Q

What can be executed as interactive single-Item for a product or as total planning for a group of products that may be freely defined (e.g. all products from a plant)?
Please choose the correct answer.

Response:

Advanced Planning

Hardware token

Heuristics

Keypad PIN

A

Advanced Planning

18
Q

You are designing the migration of data for a new SAP S/4HANA Cloud customer. What must the customer do to prepare?
Please choose the correct answer.

Response:

Design the interfaces with the non-SAP legacy system for mass transfer.

Select the applicable data migration objects from the complete list of objects.

Design the programs or reports needed to extract the legacy data.

Change the provided Excel templates to match the customer’s requirements.

A

Design the programs or reports needed to extract the legacy data.

19
Q

Is Production Version is also required for phantom items?
Please choose the correct answer.

Response:

No

Yes

A

Yes

20
Q

What can be executed as interactive single-Item for a product or as total planning for a group of products that may be freely defined (e.g. all products from a plant)?
Please choose the correct answer.

Response:

Keypad PIN

Heuristics

Advanced Planning

Hardware token

A

Advanced Planning

21
Q

What are some of the benefits that the SAP Best Practices scenario Make-to-Order Production - Semi-finished Goods Planning and Assembly (1BM) can provide?
There are 2 correct answers to this question.

Response:

Reduce total lead time

Optimize lot size of finished goods production order

Minimize inventory of semifinished goods

Create purchase requisitions for raw materials early

A

Reduce total lead time
Create purchase requisitions for raw materials early

22
Q

Based on pegging relationships, the system can:
There are 3 correct answers to this question.

Response:

Identify planning problems on various production levels and display them using alerts

Optimize delays and storage costs in PP/DS optimization

Automatically forward scheduling specifications for an order to the dependent orders in the pegging structure, in Detailed Scheduling

Select the applicable data migration objects from the complete list of objects.

A

Identify planning problems on various production levels and display them using alerts

Optimize delays and storage costs in PP/DS optimization

Automatically forward scheduling specifications for an order to the dependent orders in the pegging structure, in Detailed Scheduling

23
Q

The Optimization allows to optimize the ___________ and the ___________ of existing operations/activities that were previously generated by the production planning run or manual planning.
Please choose the correct answer.

Response:

production dates/sequences, resource assignment

Poor system logging

Cross-site scripting

Server-side request forgery

A

production dates/sequences, resource assignment

24
Q

What is used to assign suitable existing product receipts and product stocks, which can cover the requirement, to a product requirement?
Please choose the correct answer.

Response:

Gray box test

Pegging

Phishing

3rd Party Vendor breaches

A

Pegging

25
Q

Which user ID must be locked for security reasons after you create an administrator business user?
Please choose the correct answer.

Response:

SAP Lifecycle Management Administrator (SAP_LMADM)

SAP E-Mail Inbound Processing (SAP_SMTP_IN)

SAP Customer Business User (SAP_CUST_BUS)

SAP Customer Initial User (SAP_CUST_INI)

A

SAP Customer Initial User (SAP_CUST_INI)