Q

How to schedule an operation from one alternative resource to another by drag & drop on the Detailed Scheduling Planning Board, in automatic rescheduling or optimization in case of overload?
Please choose the correct answer.

what is the value of the information that could be discovered through the system compromise?

what is the specific threat that your system is facing?

what mitigation strategies could be deployed to address the issues that are found?

you have to add an alternative sequence to a routing with an alternative work center.

A

you have to add an alternative sequence to a routing with an alternative work center.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is a monitoring Tool that provides the planner pointed information and access to problem situations in production planning in ePP/DS?
Please choose the correct answer.

Alert Monitor

Natural Disasters

IP Infringement

Espionage

A

Alert Monitor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Based on the generated orders in Detailed Scheduling (DS) the orders and operations are

Fixed

Dynamic

CVSS

All of the above

A

Fixed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

With the new Record Inspection Results app, a Quality Technician can now:
There are 3 correct answers to this question.

View the number of defects on the worklist page

Display defect number, defect code group, defect category, defect description, and date of creation of defect on the defect details popover

Navigate to the Process Defects app from the defect details popover

You can start a standalone master server by executing.

A

View the number of defects on the worklist page

Display defect number, defect code group, defect category, defect description, and date of creation of defect on the defect details popover

Navigate to the Process Defects app from the defect details popover

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is a planning function that executes planning for selected objects (in this way, the focus of planning can be products, orders, operations, resources, or line networks) using a particular algorithm?

MRP run

Heuristic

penetration test

Metasploit

A

Heuristic

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which solution supports you in identifying root causes of problems, taking actions to prevent such problems in the future, and documenting the problem–solving process?

Maximum response waiting time

Path to file name to read from

Only when you call an action

SAP Supplier Problem–Solving

A

SAP Supplier Problem–Solving

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are some key steps in the SAP Best Practices scenario Nonconformance Management (2QN)?
There are 2 correct answers to this question.

Execute root cause analysis

Complete defect processing

Process defect

Define preventive actions

A

Complete defect processing

Process defect

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Which of the following option you can choose at the time of releasing a simulation in the Process pMRP Simulation app?
Please choose the correct answer.

Decision Table, Scorecards, Decision trees and Predictive models, as well as expressions.

To connect to a specific cluster, open the cluster menu by clicking the Attached/Detached menu item and then selecting your desired cluster.

This script takes care of: setting up the class path with Spark and its dependencies

To have capacity proposals created and exported to the Mass Maintenance of Work Center Capacities app for capacity adjustments.

A

To have capacity proposals created and exported to the Mass Maintenance of Work Center Capacities app for capacity adjustments.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which option covers a wide range of production planning functions and therefore cannot be described comprehensively?
Please choose the correct answer.
The extremely flexible product planning table

Detailed Scheduling planning board

PP/DS Optimizer

Release invoice for payment.

A

PP/DS Optimizer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What was enhanced to provide additional selection criteria for the automatic processing of change requests for which no response has been received from suppliers?
Please choose the correct answer.

Spark’s unified platform

Sharing information from memory

The app Schedule Processing of MRP Change Requests

To launch a Spark standalone cluster

A

The app Schedule Processing of MRP Change Requests

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The operations in ERP Planned Orders are:
Please choose the correct answer.

To fix a pegging relationship.

The operations of the Standard sequence scheduled to the Basic dates.

Detailed scheduling planning board

By changing resources (capacity, work times, and so on) or changing orders (quantities, data)

A

the operations of the Standard sequence scheduled to the Basic dates.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which of the following capabilities can you use in the SAP Fiori app Manage Usage Decisions?
There are 2 correct answers to this question.

Record inspection results.

Change the inspection lot ID.

Edit comments of an inspection lot.

View contextual information related to material.

A

Edit comments of an inspection lot.

View contextual information related to material.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which of the following option is integrated into the SAP S/4HANA Material Master with CDS Redirects on material master?
Please choose the correct answer.

In Production Planning and Detailed Scheduling.

Production Planning orders

Advanced Planning Product Master

The BADI implementation CUSLNTRTO_ADDIN

A

Advanced Planning Product Master

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The priority of change request proposals can also be determined based on an:
Please choose the correct answer.

Easy data exploration allows teams to determine what the data lets you do.

Interactive dashboards empower teams to create dynamic reports.

Implementation of the Business Add-In Retrieve Priority for MRP Change Request

A strategy that contains an Adaptive Model component is executed.

A

Implementation of the Business Add-In Retrieve Priority for MRP Change Request

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The consumption-based procedures of forecast- based and time-phased planning are supported in ePP/DS.
Please choose the correct answer.

True

False

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

For which extensibility approach do you use the SAP Cloud Platform?
Please choose the correct answer.
Key user extensibility

Side-by-side extensibility

Classic extensibility

Managed extensibility

A

Side-by-side extensibility

17
Q

The overall planning process starts with which of the following requirements?
Please choose the correct answer.

Databricks

Regression

Independent

Generic Algorithm

A

Independent

18
Q

The Material requirements planning in PP/DS is usually evaluated from where?
Please choose the correct answer.

Data sensitive labeling

Product view

Asset Identification

Threat Evaluation

A

Product view

19
Q

What must be defined in SAP Central Business Configuration prior to creating the organizational structure?
There are 2 correct answers to this question.
Fiscal year variant

Group currency

Chart of accounts

Leading ledger

A

Fiscal year variant

Group currency

20
Q

In SAP S/4HANA Demand Planning to generate forecasts as a future demand program is executed in
Please choose the correct answer.

Their requirement type or by the requirements strategy.

Navigate to the Process Defects app from the defect details popover

Integrated Business Planning (IBP).

You can start a standalone master server by executing.

A

Integrated Business Planning (IBP).

21
Q

What does provide advanced planning options and is especially suitable for repetitive manufacturing?
Please choose the correct answer.

Response:

The extremely flexible product planning table

Detailed Scheduling planning board

PP/DS Optimizer

Release invoice for payment.

A

The extremely flexible product planning table

22
Q

In the SAP Ariba Payment and Discount Management process, what step comes immediately after the Suggest a Discount for Early Processing step?
Please choose the correct answer.

Response:

Update payment proposal.

Start payment run.

Release invoice for payment.

Evaluate payment suggestion.

A

Evaluate payment suggestion.

23
Q

What is primarily used in the context of capacity planning and optimization, that is, in the step after material requirements planning?
Please choose the correct answer.

Response:

Attack surface

Code review

Service heuristics

Attack tree

A

service heuristics

24
Q

Which of the following option makes a statement about the compactness of the orders within the optimization horizon?
Please choose the correct answer.

Response:

Accelerate ETL

Google AI platform

Import external models used

Production span

A

production span

25
Q

Where do you activate SAP Best Practice processes in your quality system?
Please choose the correct answer.

Response:

SAP Best Practices Explorer

SAP Solution Builder

SAP S/4HANA Cloud Manage Your Solution app

SAP Central Business Configuration

A

SAP Central Business Configuration

26
Q

In ePP/DS in PP, What are the orders generated according to the required stock-/requirement situation and lot-sizing procedure (infinite order scheduling)?
Please choose the correct answer.

Response:

In Production Planning and Detailed Scheduling.

Production Planning orders

Advanced Planning Product Master

The BADI implementation CUSLNTRTO_ADDIN

A

Production Planning orders

27
Q

What does the calculation of the Accuracy in the Maintain PIRs app considers?
Please choose the correct answer.

Response:

applying this to your strategies will enable them to detect changes in customer behavior as they occur and act on them immediately.

the withdrawal quantity making the forecast accuracy of the planned independent requirements (PIRs) even more precise.

where the argument to the for each method is an expression for an anonymous function.

allows you to write quick throw away functions without naming them

A

the withdrawal quantity making the forecast accuracy of the planned independent requirements (PIRs) even more precise.

28
Q

What will you/be determined using planned independent requirements from a demand forecast, sales orders or stock transfer requirements?
Please choose the correct answer.

Response:

SAP EWA provides the most comprehensive security check

The demand program, which has to be covered by the production planning in the plant / MRP_Area

Configuration validation can check if security policies were applied

Configuration validation helps to standardize and harmonize security related configuration items for ABAP systems only

A

The demand program, which has to be covered by the production planning in the plant / MRP_Area

29
Q

What is a solution that enables a collaborative problem–solving process together with suppliers?
Please choose the correct answer.

Response:

SAP Supplier Problem–Solving

Path to file name to read from

Maximum response waiting time

Only when you call an action

A

SAP Supplier Problem–Solving

30
Q

Item grouping in multilevel BOM allows BOM engineers to group BOM items together so as to structure the BOM in an organized fashion without creation of subassembly material.

This enables BOM engineers to:
There are 3 correct answers to this question.

Response:

Databricks Enterprise Security Framework

Represent the modular structure of the product in a multilevel BOM

Group component variants in variant BOMs

Group a BOM without creating additional materials

A

Represent the modular structure of the product in a multilevel BOM

Group component variants in variant BOMs

Group a BOM without creating additional materials