Year 1 CEC Flashcards
Identify the topic dealt with in Section 8
CCT loading and demand factors
Identify the topic dealt with in Section 22
Locations in which corrosive liquids, vapours, or excessive moisture are likely to be present
Identify the topic dealt with in Section 40
Electrical cranes and hoists
What section deals with grounding?
Section 10
What section dealt with swimming pools?
Section 68
(Pools, tubs and spas)
What section deals with Mobile home and RV Parks?
Section 72
Identify the content of Section 0 of the CEC
Object, scope and Definitions
Identify the general content of Section 4
Conductors
Where in the code book do you find additional information on rules?
Appendix -B - Notes of rules
What are the two main concerns that prompted the writing of CEC?
Section 0 - Object - Prevention of fire and Shock Hazards
What values of voltage are considered as ‘High voltage’ and ‘Low Voltage’?
High Voltage: 1kV + (AC)
Low voltage: 31V - 1kV (AC)
Extra low voltage Less than 30V (AC)
There is NO MEDIUM
Source: Section 0 - Definition Voltage - P 71
Describe the CEC Numbering system
Rule: 00-000
Subrule: 1)…
Item: a)…
Item: i)…
Item: A)…
Source: CEC, Page 34, 2021
Before commencing any section, what is the most important feature that must be read
Scope
In what year was the CEC adopted formally approved?
1927
Source: Preface, CEC, 2021, P 33
Conduit trade sizes have now gone to metric. What is the metric size is 1 1/2’’?
Metric 41
Source: Part 1, Conduit, tubing, and fitting sizes; CEC, 2021, P 37