Q

What are the Ten Concepts in Well v2

A

Air, Water, Nourishment, Light, Movement, Thermal Comfort, Sound, Materials, Mind, Community

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are Preconditions

A

Preconditions define the fundamental components of a WELL Certified space and serve as the foundation of a healthy building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are optimizations

A

Optimizations are optional pathways for projects to meet certification requirements in WELL. Project teams may select which optimizations to pursue and which parts to focus on within each optimization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What type of system is WELL v2 based on and how is each scorecard graded?

A

WELL v2 operates on a points-based system, with 110 points available in each project scorecard. All optimizations are weighted with varying point values.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the process for onsite verification called

A

Performance Verification

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the WELL Project Types?

A

Owner Occupied: The project is mainly occupied by the project owner (which may be different than the building owner).

WELL Core: The project owner occupies a small portion of the project area and rents/leases most of the space to one or more tenants.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What type of building can register for WELL Core?

A

Any building type can register for WELL Core, provided that at least 75% of the project area is occupied by one or more tenants and/or serves as common space in the building accessible to all tenants.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Types of Applicability Designations

A
Whole Building
Extent or Developer Buildout
Leased Spaces
Non-leased spaces
Building Management Staff
Direct Staff
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Explain Whole Building applicability designation

A

Includes all areas within the project boundary. To use this pathway, project teams need to submit as part of documentation review, design assumptions and sample cut-sheets (as applicable) that justify the budget and can be used by the tenant during their design and construction process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Explain Extent of Developer Buildout Applicability designation

A

Includes all non-leased space and all construction within the leased space for which the project team is responsible.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Explain Leased Spaces applicability designation

A

All areas within the project boundary that are leased to or owned by tenants, including areas for lease or for sale that are not currently occupied.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Explain Non-Leased Spaces

A

All Areas within the project boundary that are not considered leased space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Define Building management Staff

A

Individuals responsible for maintaining the building including contractors and sub-contractors. Workers who spend less than 30 hours a month are not considered.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Defne Direct Staff

A

Building staff under direct employment of the owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How much of a building floor area must be available for performance testing

A

2.5%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is required for multifamily residential projects to pursue WELL

A

Must contain at least 5 dwelling units in a single building with common structural elements

17
Q

Projects may pursue no more than ____ points per concept and no more than ____ points total across all ten concepts

A

12 and 100

18
Q

What concept can projects pursue an additional 10 points in

A

Innovation

19
Q

What is important when determining a project boundary

A
  • boundary must be consistently applied across all features
  • may not unreasonably exclude portions of a building
  • communicate the scope of the project in promotional and descriptive materials
  • must be defined by a clear boundary
20
Q

Project boundary can include both interior and exterior spaces, true or false

A

True

21
Q

What does “space type” refer to

A

Refers to the spaces within the project rather than the project as a whole

22
Q

Define regularly occupied space

A

areas inside the project where a particular individual normally spends at least one continuous hour or two hours per day

23
Q

define occupiable spaces

A

Spaces that can be occupied for any task or activity

24
Q

Rooms larger than ____m^2 may be divided into separate zones

A

930 m^2

25
Q

Define

occupant

A

Any individual within the project boundary

26
Q

Define Regular occupant

A

An individual who spends at least 30 hours per month across at least 5 days within the project boundary

27
Q

Define Visitor

A

Any occupant who is not a regular occupant

28
Q

define Employee

A

An individual who works for the project owner within the project boundary

29
Q

Define Eligible employee

A

An employee identified as qualifying for benefits

30
Q

When making Calculations for WELL rounding is acceptable, true or false

A

false