VSMP Overview (Module 5) Flashcards

1
Q

What 5 things need to be included in a SWPPP?

A
  • Approved erosion and sediment control plan
  • Approved stormwater management plan
  • Pollution Prevention Plan
  • Any addition control measure needed to address a TMDL
  • Performance measures

(Module 5 / Page 3)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What needs to be recorded in the local land records before termination of a land disturbance permit?

A

-a long-term maintenance agreement for permanent stormwater management facilities

(Module 5 / Page 3)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What does a plan reviewer need to approve before approving the stormwater management plan?

A

The long term maintenance agreement

Module 5 / Page 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What five things need to be complete before permit coverage can be issued?

A
  • Registration statement is complete
  • Stormwater management plan has been approved
  • Long-term maintenance agreement has been approved
  • Erosion and Sediment Control Plan has been approved
  • All fees have been paid

(Module 5 / Page 4)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Whose responsibility is it to confirm the registration statement, SWM plan, ESC plan, and long-term maintenance plan are approved and all fees have been paid?

A

the program administrator

Module 5 / Page 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

By signing the Construction General Permit registration statement, the operator is verifying what plan has been prepared?

A

The operator certifies the SWPPP has been prepared

Module 5 / Page 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is an “as-built”?

A

Certified project record drawings assembled after construction completion

(Module 5 / Page 6)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Why is it important for the VSMP to maintain record of as-built drawings, inspection records, and enforcement records at the completion of the project?

A

Because the Program Administrators need to report some of this information pertaining to enforcement actions, exceptions, and specifics pertaining to BMPs installed to the DEQ every year.

(Module 5 / Page 6)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When does the VSMP authority need to return or terminate any bonds associated to a completed project?

A

Within 60 days of completion

Module 5 / Page 6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the purpose of the regular 5 year inspections for each stormwater management facility?

A

To ensure they are being adequately maintained as designed.

Module 5 / Page 6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly