Volume 1, Unit 2 Flashcards
What is the purpose of the maintenance supply system?
Procure, stock, and issue items to customers
What areas of major weapon systems do GLSCs manage?
Aircraft, engines, communications, test stands, aerospace ground equipment, vehicles, and pods
What manual prescribes standardized procedures for supplies by Air Force organizations?
AFMAN 23-110
What are the four primary points of contact within Base Supply?
- Customer service
- Retail sales
- Equipment maintenance
- Demand processing
What is the most common term for repair cycle assets?
Due in from maintenance parts
What Base Supply function manages the repair cycle system?
Repair Cycle Support System
What is the purpose of the repair cycle system?
To ensure parts are repaired as fast as possible
When does the repair cycle time of an item start and stop?
Starts: when part is removed and demand is made to Base Supply for a replacement
Ends: when Item is sent back to Base Supply
When you route a part to be repaired through the Repair Cycle Support System (RCSS), which part of the AFTO Form 350 do they need?
Bottom portion
What types of items generally require complete depot-level overhaul?
- Time change items with expired dates
- Items involved in weapons system accident
- Contaminated items
- Items with undetermined conditions
List four of the important supply documents that you may utilize.
- Daily Document Register (DO4)
- Priority Monitor Support (D18)
- Repair Cycle Asset Management Listing (D23)
- Due-Out Validation Listing (M30)
Which supply document provides a means for organizations to review all document numbers processed during the day by the Standard Base Supply System (SBSS)?
Daily Document Register
Which supply document provides data by which to monitor due-outs and their corresponding status?
Priority Monitor Report
Why must Base Supply have a priority system in place?
To recieve parts in a timely manner
What two priority systems does supply use?
- Delivery Priority System
2. Uniform Material Movement and Issue Priority System (UMMIPS)
What two factors determine the priority if an off-base requisition?
- The Urgency Justification Code
2. Force Activity Designator
What factor is adversely affected by misuse of priority designators?
Integrity of supply system, wastes resources, degrades overall supply support
What is Part I of the AFTO Form 350 known as and for what is it used?
Repair Cycle Processing Tag is attached to repairable items being forwarded to other activities for repair
Where is part II of the AFTO Form 350 located and what purpose does it serve?
Located below perforation and is used as a Production Scheduling Document
Where can you find a block by block explanation of how to document the AFTO Form 350 tag?
TO 00-20-2
When an item is not sent to the repairable processing center (RPC) because of its size or for other reasons, which additional blocks must be completed by the originator?
16, 17, and 18
When an item is sent to the repairable processing center (RPC) which blocks (both front and back) are required to be completed by the individual initiating the 350 tag?
1-14, 15A, and 29