VOCAB Flashcards

1
Q

Thermal Imaging

A

test that measures the heat flor through building objects

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

dry bulb test

A

test for ambient air temperature

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

cylinder test

A

tests the compressive strength of hardened concrete

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

slump test

A

tests workability/consistency of concrete. places fresh concrete in a cone and then removes cone, allowing the fresh concrete to “slump”. amount of slump is measured. a collapsed slump means mixture is too wet.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

STC

A

Sound Transmission Class. Represents a material’s ability to block airbone sound.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

ICC

A

International Code Council. organization that develops building codes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

NRC

A

Noise Reduction Coefficient. measures the amount of energy absorbed by a material when the sound waves reach a surface.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

IIC

A

Impact Isolation Class. Measures an aseembly’s ability to absorb noise caused by impact to a floor/ceiling assembly.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Rebar Number

A

refers to diameter in eighths of an inch. (#4 = 4/8 = 1/2”)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

water hammer

A

occurs when water flow is abruptly slowed. shock of event causes the pipes to rattle each other and the surrounding wall construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

plumbing traps

A

hold water, sealing draing from the connected sewer and preventing sewer gas from entering the building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

in-situ load testing

A

simulated anticipated loads

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

compaction test

A

tests soil for proper compaction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

tiebacks

A

used when clearance inside excavation site is tight, because tiebacks are within the earth.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

rakers

A

angled wood supports which extend from the ground of excavation site up to the walls

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

walers

A

horizontal elements used to support excavation sheeting.

17
Q

crosslot bracing

A

horizontal bracing which extends across the ground of the site from one wall to the other.

18
Q

unjust enrichment

A

occurs when party A has unfairly benefited at the expense of Party B. Under the doctrine of unjust enrichment, Party B can claim restitution.

19
Q

force majeure

A

unforseeable circumstances that prevent someone from fulfilling a contract.

20
Q

Schedule of Values

A

Allocates entire contract sum across the various portions of the work in a fixed price or gmp contract
Done by contractor and submitted to arch for review
Basis for contractor’s pay apps

21
Q

commissioning plan

A

document used to outline scope and define responsibilities of the commissioning process as well as the activities schedules and documentation required

22
Q

Basis of Design

A

term used to describe the drawings and specs which are developed according to the owner’s project requirements. OPR defines goals and expectations

23
Q

amount of yards in an acre

A

4840 yards

24
Q

overhead costs

A

ongoing business expenses that cannot be directly attributed to constructing an individual project.

25
Q

U factor

A

coefficient of heat transmittance. Lower = better insulating performance

26
Q

SHGG

A

SHGG = measurement of how much radiation is transmitted through window. Higher = more solar heat transmission. Used in visible transmittance and air leakage tests