Vacants Flashcards
All vacant buildings shall be identified and marked with what symbol?
Square marking with an X in the middle
How thick should the lines of the vacant building marker be?
2”
What are the dimensions of the vacant building marker?
18” x 18”
What color should vacant building marker be?
lime yellow (reflective type paint)
Where should primary vacant building marker be?
alongside the front entrance. if deemed advantageous, additional markings shall be made at other places (fire escape, roof, bulkhead, etc)
Fires in vapors of ______________fuel develop slowly at the start, but progress rapidly as vapor production intesifies. Heat developed will be for a longer duration than that involving gasoline, igniting more of the combustible materials in the area
diesel fuel
____________ vapors, immediatley upon ignition, burn with lightning rapidity with high heat production.
gasoline
All members responding to vacant building fires, (especially ___________ & _________ ff’s) are cautioned to note the method used to seal these buildings in their size-up
roof/outside vent
Proper size-up is most important for the officer in command. In execution of the fire attack plan, the same order of priorities apply as in firefighting in occupied buildiings, i.e. _______, _________, ________ & _______
life, exposures, confinement, & extinguishment (L.E.C.E.)
What is the most important aspect in determining the initial attack strategy (interior or exterior)?
Structural Stability
The officer in command at a vacant building fire must take into account how many sides of the building?
six sides (four sides at the same level, as well above and below)
What is the most important consideration in size-up at a vacant building fire?
Protection of life
When a vacant building is heavily involved on arrival, where are the first hose streams placed?
between the involved building and the most “severe life exposure”
When a vacant building is heavily involved on arrival and no life is endangered in the exposures, where do you position the first stream?
to protect the greatest amount of property
What does “R.O.” over the vacant building marking mean and where is it placed?
Roof Open – if the roof has been previously opened or burned away, to the degree that the need for future vertical ventilation appears minimal, place R.O. over the vacant building marker (and both inside and outside of the bulkhead as well)