Vacants Flashcards

1
Q

All vacant buildings shall be identified and marked with what symbol?

A

Square marking with an X in the middle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How thick should the lines of the vacant building marker be?

A

2”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the dimensions of the vacant building marker?

A

18” x 18”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What color should vacant building marker be?

A

lime yellow (reflective type paint)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Where should primary vacant building marker be?

A

alongside the front entrance. if deemed advantageous, additional markings shall be made at other places (fire escape, roof, bulkhead, etc)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Fires in vapors of ______________fuel develop slowly at the start, but progress rapidly as vapor production intesifies. Heat developed will be for a longer duration than that involving gasoline, igniting more of the combustible materials in the area

A

diesel fuel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

____________ vapors, immediatley upon ignition, burn with lightning rapidity with high heat production.

A

gasoline

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

All members responding to vacant building fires, (especially ___________ & _________ ff’s) are cautioned to note the method used to seal these buildings in their size-up

A

roof/outside vent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Proper size-up is most important for the officer in command. In execution of the fire attack plan, the same order of priorities apply as in firefighting in occupied buildiings, i.e. _______, _________, ________ & _______

A

life, exposures, confinement, & extinguishment (L.E.C.E.)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the most important aspect in determining the initial attack strategy (interior or exterior)?

A

Structural Stability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The officer in command at a vacant building fire must take into account how many sides of the building?

A

six sides (four sides at the same level, as well above and below)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the most important consideration in size-up at a vacant building fire?

A

Protection of life

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When a vacant building is heavily involved on arrival, where are the first hose streams placed?

A

between the involved building and the most “severe life exposure”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When a vacant building is heavily involved on arrival and no life is endangered in the exposures, where do you position the first stream?

A

to protect the greatest amount of property

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What does “R.O.” over the vacant building marking mean and where is it placed?

A

Roof Open – if the roof has been previously opened or burned away, to the degree that the need for future vertical ventilation appears minimal, place R.O. over the vacant building marker (and both inside and outside of the bulkhead as well)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are advantages of in-line pumping?

A

1) fast water on fire – 2) pumper in position for exterior stream – 3) equipment on pumper closer to fire – 4) shorter/faster hand liine – 5) lower engine pressure – 6) ECC in better position to observe op’s if needed

17
Q

What are disadvantages of in-line pumping?

A

1) water supply limited to line layout/hydrant potential – 2) it may not be possible to attain full pumper capacity – 3) engine could block out ladder – 4) if hydrant OOS, may not be able to proceed to next hydrant b/c blocked in – 5) possible damage by falling debris

18
Q

If backstretching at a vacant building fire and it is evident that more than one line will be needed on the fire, what shall the office order?

A

second line to be droppend in front of the fire building before the pumper proceeds to the hydrant

19
Q

When supplying aerial to TL pipes, what diameter hose shall be used?

A

Largest diameter hose shall be used

20
Q

When stretching hand lines into exposures for operations into the fire building, what should be considered in a vacant building fire?

A

2 1/2” lines with solid stream nozzles should be considered

21
Q

What is the main objective in the placement of exterior streams at a vacant building fire?

A

to obtain the greatest coverage, while bearing in mind the safety of members involved. Tower ladders should be positioned to cover TWO sides of a building

22
Q

Who surveys the lot at a vacant building fire if a TL is going to be set up in it to operate?

A

MUST be surveyed by both officer and chauffeur (to determine the condition of the rubble and whether it will support the weight of the rig)

23
Q

At a vacant building fire where a T.L. is operating in a vacant lot, how should the T.L. boom be operated?

A

Narrow angles, over the front or rear of the apparatus. (SHOULD NOT be operated at right angles to the chassis at low elevations)

24
Q

Generally, in a vacant building fire, is there a need for VES from the fire escape?

A

No need for it

25
Q

What is the primary emphasis in vacant building operations?

A

that of exterior operations