Unit 8 Flashcards
What are the advantages of using Building Information Modelling (BIM) in construction?
Advantages include:
* Improved collaboration
* Enhanced visualization
* Increased efficiency
* Better cost management
These advantages contribute to overall project success and client satisfaction.
What are the benefits of a post occupancy evaluation for a BSE contractor?
Benefits include:
* Understanding user satisfaction
* Identifying areas for improvement
* Assessing building performance
* Enhancing future project planning
A post occupancy evaluation provides valuable feedback that can inform future designs and practices.
What are three general areas of confirmation provided by certification issued on completion of a building services project?
Confirmation areas include:
* Compliance with regulations
* Adherence to client specifications
* Verification of system performance
Certification ensures that the project meets necessary standards and requirements.
List three digital systems or platforms that require basic programming or digital set-up before handing over to the client.
Examples include:
* Building Management Systems (BMS)
* Energy Management Systems (EMS)
* Computerized Maintenance Management Systems (CMMS)
These systems often require customization to meet specific client needs.
What are two methods for scheduling construction works?
Methods include:
* Gantt charts
* Critical path method (CPM)
Both methods help in planning and visualizing project timelines.
How is a Gantt chart used to monitor current progress in a construction project?
A Gantt chart is used to:
* Track project timelines
* Compare planned vs. actual progress
* Identify delays
* Allocate resources effectively
Gantt charts provide a visual representation of tasks and their timelines.
How can a company reduce the risk of a cyber-attack?
Methods to reduce risk include:
* Implementing strong passwords
* Regularly updating software
* Conducting employee training
These measures help protect sensitive data and systems.
What is firmware?
Firmware is a type of software that provides low-level control for a device’s specific hardware.
It is usually embedded in the device and is essential for its operation.
Why does firmware need to be updated regularly?
Firmware needs updates to:
* Fix bugs
* Enhance security
* Add new features
Regular updates ensure the device operates efficiently and securely.
Describe the expectations of three different types of stakeholders involved in a construction project.
Stakeholder expectations include:
* Clients: Quality work within budget and timeline
* Contractors: Clear communication and resources
* Regulators: Compliance with laws and safety standards
Each stakeholder has unique interests that must be managed for project success.
What is the purpose of a schematic diagram for a building service system?
The purpose is to:
* Provide a visual representation of system components
* Facilitate understanding of system interactions
* Assist in troubleshooting and maintenance
Schematic diagrams are crucial for effective communication among project stakeholders.
Calculate how much, in pounds, the contractor needs to reimburse the client for the use of the utilities during the refurbishment.
To calculate, sum up the total utility usage multiplied by the per unit cost, showing workings:
* Total cost = (Utility usage before - Utility usage after) × Cost per unit
Ensure to provide specific utility readings and costs for accurate calculation.
What data produced from a building management system could be used for? Provide one example.
Data can be used for:
* Energy consumption analysis
* Example: Adjusting HVAC settings based on occupancy data
This analysis can lead to improved energy efficiency and cost savings.
Describe the components that each of the following symbols represent:
Components include:
* a) [Component description]
* b) [Component description]
* c) [Component description]
Each symbol corresponds to specific elements in a building service system.