UH-60 Army Hoist SOP Flashcards

1
Q

Hoist Currency Requirements

SP/IP/UT/PC/PI – RCMs conduct, at minimum, a dummy load static or dynamic hoist iteration at any height in either mode of flight every ___ days to stay hoist current.

A

90

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Hoist Currency Requirements

Exceeding ___ days requires a hoist PFE.

A

90

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Hoist Currency Requirements

Exceeding ____ days requires hoist refresher training.

A

180

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Live/Dummy hoist training wind limitation

A

“Live/Dummy” hoist training operations are not conducted with winds greater than 35 knots, or with a gust spread greater than 15 knots. On scene winds estimated by the PC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly