Triggers Flashcards
Read and do the Safety and Power On Checklist
When electrical power is not established on the aircraft
Flight Deck Equipment Flow
1st flight of the day or after a crew change
IRS alignment
Every flight
Exterior inspection
Every flight and last flight of the day when an asterisk appears after the destination airport on the release header
Flightdeck Preparation Flow
1st flight of the day
Crew change
Prior to flights >162nm offshore
Unobserved maintenance in the flightdeck
Before Start Flow
APU start, if not running
Approximately 10 mins prior to departure and ATC clearance verification
Before Pushback Flow
After receiving the cabin ready notification and all doors are closed and armed
After Start Flow
Ground equipment cleared
CA has a salute
Engine(s) stabilized
Taxi Flow
After gate departure
Load Closeout received
Both engines running
Flaps set for takeoff
Before Taking the Runway Flow
2-3 minutes prior to taking the runway
What is accomplished after FD Preparation Flow?
ATIS
Clearance
Set initial altitude
Set transponder code
What is accomplished after the flight documents are received?
FA brief Flight plan/Release review Frequencies/Courses Fit for Duty FMS Loading
What is accomplished after FMS routing is loaded?
ATC route verification
GMT correct
ATSU/ACARS entries
(flt number, dep/dest)
What happens approximately 15 mins from pushback?
Welcome Aboard announcement
ACM briefing
What is accomplished after Before Start Flow and fueling is complete?
Check fuel quantity
Send fuel
After Takeoff Flow
After flap retraction and prior to 10,000 AFL
AHEFOE checks
Approximately every hour at or abeam the closest flight plan waypoint
What is accomplished as early as possible prior to TOD, while workload is at a minimum?
ATIS
Changeover report
Build/Verify approach
Brakes
Brief