Tools 7 - D.S. 17 High Rise Nozzle Flashcards

1
Q

High Rise Nozzle description

A
  • 1 1/2” Diameter Aluminum pipe
  • Approximately 10 lbs.
  • 2 1/2” S/O - * S/O is Permanently attached to the nozzle.
  • 1 1/8” MST - Removable & checked WEEKLY during MUD and BEFORE USE
  • 8’ long
  • 68 degree, 2’ bend
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

High Rise Nozzle additional info

A
  • Supplied by a 2 1/2” H/L
  • Flows of 200-225 fpm @ 50 PSI nozzle pressure w/ water flowing
  • Standpipe pressure gauge MUST be used
  • 3 lengths of 2 1/2” hose will be 70 psi w/ water flowing
  • 4 lengths of 2 1/2” hose will be 80 psi w/ water flowing
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

T or F - If the equipment and resources are available and wind conditions exist, the HRN should be placed in position as a precaution EVEN IF the need is not immediately evident.

A

True
Tools 7
HRN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Which engine company is responsible to bring the HRN to the CP?

A

It is the responsibility of the 4th due engine to bring the HRN to the CP.
* If the 4th due engine is not equipped with a HRN, the OFFICER shall contact the dispatcher for the identity of the engine company equipped with a HRN assigned on the box.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Upon arrival where the HRN is required, what additional equipment is required to be brought to the LCP?

A

Upon arrival, the officer will have the unit bring

  • the HRN
  • One length of 2 1/2” hose per FF
  • the Standpipe kit w/ controlling nozzle
  • report to the IC at the LCP
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who will order the HRN to placed INTO OPERATION?

A

The HRN will ONLY be placed into operation at the direction of the IC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

T or F - Depending on the situation, the 2 1/2” H/L supplying the HRN may have to be stretched from THREE floors below the fire.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

MUST the supply line be attached to the HRN before the nozzle is slid out on the window sill for use?

A

Yes, the supply line MUST be attached to the HRN before the nozzle is slid out on the window sill for use.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

T or F - A S/O shall be placed IN LINE ONE LENGTH back from the nozzle.

A

True

  • The officer supervising nozzle operations will order water started
  • Officer will then notify the IC that the nozzle is in position and ready to operate
  • The nozzle will NOT be operated until the IC has given approval.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The COMPANY OFFICER shall contact whom if repairs to the HRN are required?

A

If repairs are required, the company officer shall contact TSD via phone and request a replacement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly