Thames Tideway Tunnel Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

why is London’s sewer network beginning to deteriorate?

A

expanding population and increasing demands of modern day living has means it is struggling to cope

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

what does the Victorian design mean?

A

raw sewage is directed straight into the Thames and this happens once a week

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

when was the thames tunnel built

A

1858

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

effects of the Victorian designed tunnel

A

lots of aquatic life killed
public health threatened
raw sewage washed into the river

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

what strategy was introduced to improve the tunnel

A

Tunnel Boring Machine (TBM) used to excavate the tunnel to 7m in diameter
it will divert sewage away from the thames to deeper underground treatment sites