Test 1 Flashcards
A mutually binding legal relashionship obligating a seller to funish supplies/surface and a buyer to pay for them.
Contract
A mutually binding legal relationship obligating a seller to furnish supplies and services and a buyer to pay for them.
Contract
This act prevents kickbacks to employers and unlawful payroll deductions.
Copeland act
The surveillance method that is the most costly.
100% Inspection
The type of drawing that provides information to manufacture a machine part or erect a structure.
Working
Shows contours, boundaries, roads, utilities, trees and other signature structures.
Plot plan
The project safety plans require that each DFOW has?
Activity Hazard Analysis ( AHA)
Known as the backbone of the contractors quality control system.
Three phases of control
The form that contains a list of quantities types, sizes and units of material required to construct the object in the drawing.
Bill of Material
The only two approval authorities for submittals is
Government and QC Mananger
Responsible for all aspects of a contracting office
OIC
The contract that includes construction alteration and or repair of public buildings
Facilities support construction contract ( FSCC)
The standard used to write a facility support service contract is subject to the provision that the service act of 1965 exclusively governors the wage rate.
Uniform Contract Format (UCF)
The quality assurance plan focuses on
The quality of the product delivered by the contractor.
Original contract drawings that are changed to incorporate actual construction conditions from redline drawings
As built drawings
The type of specifications that are written for small groups of specialized structures that require uniform construction to meet rigid requirements.
Naval facilities standard specifications.
The method of surveillance that is based on customer awareness.
Validated customer complaint
This type of plan requires a submittal to be sent to the ROICC/FEAD for all non contingency fruction operations
QC / QA
The purpose of the construction quality management is to achieve the quality established by properly developed requirements through the combined responsibility but separate efforts of what type of personnel.
Contractor and Governemet Personnel
Who does the qc inspector report to
QC Manager
What is the quality control manager responsible for
Management
How many days is the prepatory phase
3 work days
What are the three phases of control
Preparatory, initial and follow up
Which of the three phases of control is conducted daily
Follow up
Under what category of drawings is a plot plan and sight plan found
Civil Drawings
What are preliminary drawings used for
Not to be used for construction strictly for initial concepts.
How many copies of as built drawings must be submitted to QC/ROICC
2 sets
How often does qc need to update as built drawings
Every 2 weeks
How often does QA need to update as bill drawings
Every month
Where is the title block found on prints
Lower right corner
What type of work falls under a facility support contract / combo
HVAC
How many calendar days must a contractor wait after receiving notice to begin work
15 calender days
How many contracting officer technical reps are assigned to each project
1
After _____ business days, the contractor must provide ____copies of the schedule to the contracting office after work begins.
5, 3
What is the requirement to pay local prevailing wages on PW projects in excess of $2000 for construction.
Davis bacon act of 1931
What bands child labor under age of sixteen for contracts exceeding $15000
Walsh healy public contracts act
What is a DD1354
Transfer an acceptance form.
When is the project turnover memorandum completed
Once inspections are completed in an agreement is made
What format must a claim be in
Written
Liquidated damages over _________ amount should be in the contract
$25000
What percentage of pay can be held under satisfactory progress
10%
What is the PURPOSE of the quality assurance plan
Improve communication, easy to use, and to reduce paperwork
What does the quality assurance plan FOCUS on
Quality of product delivered by contractor
Who can appoint QC reps
CO, has to be in writing
What is a FAR
A field adjustment request used for changes that exceed 50 mandays or $500 must be approved by appropriate ncr before submission to roicc/fead
QC / QA plan is submitted to who and for what
All non contingency plans should be submitted to ROICC / FEAD
What are the forecategories of the surveillance contract service
Input, processing, documentation, output