Systems And Equipment Flashcards
State PMS for diving chambers and viewport.
Also special consideration for bell
6 monthly
Visual
2.5 years
Max Working pressure leak test
5 years
Overpressure test 1.25x MWP
10 years
Replace view ports
Bell needs Ext Pressure test every 5 years
State the PMS for man riding winches.
6 months:
-Visual and function test @max SWL
-Static load test on each braking system @ 1.25 x SWL
1 year
Static load test on each independent brake @1.5 x SWL
NDT of critical areas after the test
Umbilical considerations;
D1 vs D2 lengths
DP Restrictions
PMS
Restrained 5m from hazards
Stby hose is 2m longer
Marked every 10m
6months- Function test
2 years- pressure test to MWP
State the PMS for umbilicals and pipeworks
6 monthly
Function/Pressure test
2 years
Leak and pressure test at max working pressure
Safety Factor of man riding and recovery type wires example; cross-haul, guide wire, main wire.
8:1 for man riding and recovery
Otherwise
2:1
State the PMS for main wire
6months
Visual inspection
Static load test @ 1.25 x SWL
1 Year
Cut back beyond first sheave and destruction test
Re-terminate and static test @ 1.5 x SWL
State breathing air compressor PMS
6 monthly IMCA
Pressure and gas purity test.
BSEN 12021
What is the most common radioactive substance used offshore?
IR 192
What is the distance that should be left clear to the top of the winch drum when spooling wire onto it?
2.5 times the wire diameter
Never overload the drum
Who is responsible for the radioactive source once it is in the water
Radiography Supervisor
Is always in charge of the source no matter the location
What should be done with grinding discs that have been subsea?
Discard them
Working at height is considered to be heights above;
2.0m
Snap hooks can be used subsea?
True or False?
The cannot.
Use safety hooks
Multi leg slings should ideally be use with legs at less than X degrees to each other and never more that Y degrees;
Less than 90 degrees and never more than 120 degrees
The maximum fleet angle at the sheave is?
1.5 degrees