SWO Flashcards
AFFF
Aqueous FIlm FOrming Foam
what are the ratios of AFFF
94% seawater
6% AFFF concentrate
what is AFFF made of?
90/10 copper nickel
safety hazard of AFFF
can create hydrogen Sulfide
what is the purpose of list control system
transfer water to maintain a zero degree list for launching aircraft
what type of water is transferred into list control tanks
potable water
how is halon activated?
5lb CO2 bottle pul pin squeeze handle
halon time delay in unmanned spaces
30 seconds
halon time delay manned spaces
60 seconds
in the event halon time delay fails, how can it be activated
time delay bypass valve
required soak time for halon
15 minute soak
15 minute ventilation time prior to entry
SCUBA
self contained breathing apparatus
EEBD
Emergency escape breathing apparatus
EEBD shelf life
15 years
how long does a EEB last
10 minutes
orange EEB color indicators
live EEBD
blue EEBD
trained EEBD
fire tetrahedron
heat,
fuel,
oxygen,
Chain reaction
white smoke
class A fire
black smoke
class B fire
defeat a class B fire
AFFF, PKP, halon
defeat a class C fire
CO2 but PKP as a last resort
class C fire
electrical
class D fire
aircraft fire
defeat a class D fire
jettison, AFFF to cool
NFTI
naval firefighting thermal imager
vari nozzle patterns
wide angle,
narrow angle,
solid stream
what does PKP stand for?
potassium bicarbonate
4 types of pipe patches
soft patch,
jubilee patch,
banding patch,
EWARP
what is a soft patch rated for
150 psi
what is the jubilee patch rated at
100 psi
what is the banding patch rated at
150 psi
EWARP
emergency water activation repair patch
2 sizes of WARP
2 in by 5 ft
4 in by 15 ft
cure time of EWARP
30 minutes
soak time of EWARP
20 minutes
ESP
electrical submersible pumjp
what powers the ESP
440V
3 methods of shoring
direct compression,
cross axial,
triangulation
CBR
chemical, biological, radiological warfare
4 chemical agents
blood blister, choking, nerve
2 biological agents
pathogens,
toxins
4 types of radiation
alpha,
beta,
gamma,
neutron
CBR agent indicators
M8 paper
M9 paper
M256A1 kit
JLIST
joint service lightweight integrated suit technology
5 items contained in JLIST
trousers,
blouse,
overboots,
gloves,
glove inserts
JLIST shelf life
5 years
JLIST wear days uncontaminated
45 days
JLIST wear days contaminated
24 hours`
MOPP
mission oriented protective poster
levels of MOPP
5
hydrogen sulfide
H2S
rotton egggs
what uses the fire main
fire main system,
reefer units,
aux cooling of machinery,
flushign water for toilets,
het blast deflector,
educators
controls distribution of power
switchboard
switchboard
controls distribution of water
viral versus non vital air
vital air - operation of equipment
non vital air- non essential
MPA
main propulsion assitent
purpose of CAT system
provides force to launch aircraft
removes moisture from aircraft
dehydrators do what
where does CAT steam come from
main steam from reactor
Fire Marshall
assistant to DCA
phases of refrigeration
compression,
condensation,
evaporation,
expansion
use of LOX
aviation breathing oxygen
oxygen aviators breathe
LOX
Fyrquel
Fyrquel fluids are fire resistant phosphate ester type fluids. Fyrquel offers self-extinguishing fire resistance that is needed for critical applications. SELF-EXTINGUISHING (FIRE RESISTANT
compressed air high pressure PSI
600 - 5000 PSI
temperature of LOX
-297
where can you steer the ship
bridge,
trick wheel,
secondary control in DCC,
main propulsion,
ratchet,
pointer
purpose of the reboiler
provides steam to loads that must be separate form main steam system
father of Naval Nuclear Power
ADM Hyman Rickover
Hyman Rickover
father of naval nucelar power
first nuclear naval vessel
USS Nautilus
a sub
RO
Reactor Officer
- responsible for safety operations of reactors and aux equipment
-answers to CO
reactor scram
control rods drops to quickly shoutdown reactors for safety
shutdown of reactors quickly
reactor scram: control rods drops to quickly shutdown reactor for safety
reactor is critical
reactor is maintaining steady power
EOOW
overall responsible fo rhe operation of both ractor plants
RO
reactor operator
- responsible fo the safe operation of hte reafot
load dispatcher responsibility
maintans and manages electrical division
purpose of main lube cooler
cool lube oil by means of seawater maintains temperature bnetween 120-130 degrees
purpose of main lube strainers
- removes particualte form lube oil
what is meant by operating with the steam plants split
both reactors are operating independently
what makes potable and boiler water
distilling units
purpose of main lube oil system
lubricate the reduction gears,
main engine bearings,
removes heat created by friction
PPOW
propulsion plant watch officer
first nuclear powered aircraft carrier
USS Enterprise
first nuclear surface ship
USS Long Beach
OPTAR
operating target
DRMO
defense reutilization marketing office
ATAV
tracks material movement
one touch
tracks revision and asset visibility
GDCS
tracks, requisition and asset visibility
DLR
Depot level reapirables
NIIN
National Item Identification Number
9 digits
COSAL
coordinated shipboard allowance list
classes of HAZMAT-6
flammable, aerosols, toxic, corrosive, oxidizing, compressed gas
NAVSUP SYS COM
Naval Supply System Command
UIC
unit identification code
ANORS
anticipated not operationally ready supply
forward most chock on a ship
bullnose
bullnose
forward most chock on a shipo
next to last shot
yellow
warning shot
last shot
red
what holds the ship in place at anchor
weight of hte anchor
where is the anchor housed
hawsepipe
puprose of capstans
to heave around mooring lines
purpose of hte wildcat
hoist and lower anchor
where is the anchor chain stored
chain locker
much is 1 detachable link weight
365 lbs
length of 1 shot of anchor chain
90 ft/15 fathoms
2 ways to anchor
walking it out,
free fall the anchor
tattletale line
tells you when mooring line has reached its safe working load
color sequence of every flag in P& D line
green
red
yellow
blue
white
Green
GRYBWG
ROMEO at the dip means
ready to receive alongside, ready to come alongside
bridge lookout responsibility
to report surface, air, and animal life
responsibility of lee helmsman
input engine orders to control ship speed
responsibility of helmsman
input rudder orders orders to keep ship on course
what does ROMEO closeup mean
ready to receive yoiu alongside, ready to come alongside
who wears yellow during UNREP
Rig Captain
who wears brown during UREP
winch operatior/checker
how long is a RHIB
7 meters
purpose of steadying lines
to steady boa in hoisting and lowering operations
BRAVO hauled down
transfer completed
preferred speed of UREP
8 - 12 knots
watch stations stood by deck
helmsman,
lee helmsman,
messenger,
lookouts,
aft lookouts,
BMOW
how much weight is put on monkey lines
75%
another name for monkey lines
man ropes/safety lines
whistles during man overboard
6
4 members of a boat crew
coxswain, enginee-r, hook, officer
use of monkey lines
for boat crew to hold on to durng hoisting and lowering of RHIBS
how long is P&D line
300 ft
P&D
phone and distance
RHIB
rigides hull inflatable boat
overall incharge of UNREP station
Rig Captain
CSMC
combat systems officer of hte watch