Subsection 17 - 7.4 Avionic test equipment Flashcards

1
Q

A capacitive fuel contents system should be tested with?

A

A wheatstone bridge

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A fuel calibration test set when used to check an aircraft with half a fuel load is connected to the guage with?

A

Fuel level in series

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A fuel quantity test set has an?

A

Externally adjustable resistor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A pressure guage is fitted to a dead weight tester, the piston area 0.25 sq.in and total mass of the mass carrier and masses is 5LB. If the pressur guage is accurate what pressure in PSI will it read?

A

20 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Befor using a bonding tester, the 6ft lead has the two prongs shorted together with a piece of metal, what would the indicator read?

A

Full scale right

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Before using a dead weight tester you would?

A

Pressurise the tester to the required pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Bonding lead testers are attached with a 60ft lead connected to the main earth and a 6ft test lead is connected to?

A

Check the resistance between selected points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Circuit tests on aircraft should be carried out in the following order?

A

Bonding, continuity, insulation, functional

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Continuity of a fibreoptic cable is tested with a ?

A

Calibrated light generator and opto-power meter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

During an insulation test, the result will be dependant on?

A

The ambient conditions during the test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Electronic test equipment for fuel tank contents systems usually incorperate?

A

Variable resistors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

For an ATC ident, how do you confirm the pulse generation?

A

Use a ramp test set

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How do you prime a dead weight tester?

A

Wind handle fully in and pour fluid in the reservoir

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How should a dead weight tester be used?

A

The outlet should not be connected to the instrument until the required weights are raised by the platform

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How would you test a mach switch in-situ?

A

Use BITE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

If an insulation resistance tester is operated and the leads are suspended in free air, what will the meter read?

A

Infinity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

If the two prongs of a bonding tester are shorted and the single prong lead is in free space, what will be the reading on the scale?

A

Full scale

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

On a bonding tester the number of probes on the 60ft and 6ft leads are respectively are?

A

1 and 2

19
Q

On a static leak tester, pressure is released by?

A

A bleed valve in the tester

20
Q

Primary structure bonding should be no more than?

A

50 milliohms

21
Q

The damping force in a meter prevents?

A

Oscillation of the pointer

22
Q

The length of the lead with the two prongs on the bonding tester is?

A

6ft

23
Q

The maximum resistance between isolated conducting parts which maybe subjected to appreciable electrostatic charging and the main earth system should be?

A

0.5 megaohms or 100,000 ohms per square metre or foot

24
Q

The tong tester should only be used on?

A

Single cables

25
Q

The maximum value of bonding of a secondary structure is?

A

1 ohm

26
Q

What code should be set on the transponder when the aircraft is in an emergency condition?

A

7700

27
Q

What is the primary purpose of bonding aircraft components?

A

To ensure all components are of the same electrical potential

28
Q

What is the problem with using a megger on a piece of equipment containing capacitors?

A

Fluctuating readings will occur while the capacitors charge up

29
Q

When carrying out a serviceability check on a bonding tester, short together the three prongs of both probes and ensure which of the following?

A

A zero reading

30
Q

When carrying out an insulation check, readings will vary due to the?

A

Humidity the test was carried out under

31
Q

When connecting or disconnecting an electrical appliance the wall socket must?

A

Be off

32
Q

When insulation testing a circuit with suppressors what should you do?

A

Disconnect the suppressors as they will obscure the readings

33
Q

When testing a circuit with suppressors with a megger you should disconnect the supressors because charging/ discharging of capacitors causes?

A

Fluctuating readings

34
Q

When testing a fuel metering unit, how is it checked?

A

With a meter in series with the unit

35
Q

When testing an aircraft fuel contents indication system with fuel tanks partly filled?

A

The test set replaces the aircraft system

36
Q

When testing an anodised component with an insulation tester ensure?

A

Probes penetrate the anodised layer

37
Q

When testing thermocouples using a test set the ambient temperature?

A

Is considered every time

38
Q

When turning the handle on a megger with the probes kept apart the needle deflects?

A

To infinity

39
Q

When using a bonding tester, ensure the prongs?

A

Penetrate the anodised layer

40
Q

When using a digital meter to test a diode, a correct operation of the diode is indicated by?

A

A voltage drop of 0.3v to 0.7v

41
Q

When using a ILS/VOR ramp test set, what is the tone delete button for?

A

To test invalid flag

42
Q

When using transistorised test equipment, what should the output be?

A

Low impedance

43
Q

For the captains side, what are the two possible locations for the EHSI?

A

Below or to the right of the EADI