Study Questions Slump Flashcards
Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine what with quality requirements of the specifications under which the concrete is furnished.
Compliance
This practus cover sampling from 5 types of equipment, which are
Revolving drum, paving, stationary, open top, and continuous
The elapsed time between obtaining the 1st and final portions of the composite sample shall not exceed
15 minutes
Portions of a composite sample shall be thoroughly re mixed before beginning tests on the sample. True False?
True
Start test for slump, temperature, and air content within blank after obtaining the final portion of the composite sample.
5 minutes