purpose of storm water design

A

regulate storm water runoff so that LOS are protected and adverse effecct are minor, include biodiversity, flood damage, erosion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

building act states what min LOS

A

safeguard people
flood with 2% chance should not enter buildings
should convey storm water to the appropriate out fall with no blockages etc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

more flood mitigation requirements from CCC

A

need o.5 m free board above flood level of x year event for all habital floors
define secondary flow overland

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

considerations affecting future LOS

A

sea level rise
climate change
land settlement
future development

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

discharge consent needed for

A

both construction and operation
consetn conditions vary between councils
managment plan needed to show compliance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

what is aceptable flow path

A

not in private property because easily blocked

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

why can flood protection be hard

A

town in wrong place, los too expensive
instead control retreat
design for floods

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

how to estimate flood flows

A

rational method q=CIA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

what is free board and what does it do

A

provides contingebcy against, flood flow predictions, sea level rise. is putting houses on slats etc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

why treat storm water

A

environmental effects
asthetics
public health
recreation, like fishing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

contaminant protection statergies

A

community education
end of pipe treatmentp
planning controls
at source treatment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

example of at source treatments

A

biofiltration

sand filter etc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

end of pipe treatment

A

wet lands dry lands

large sand filter or somthing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

why are chch soils good and bad

A

pervious, good for drainiage, not for treatment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

what info is needed for design

A

infiltration characteristics

source of contamination (only roof can be discharged quick

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

resource consents require a errosion and settlement control plan

A

yes they do

17
Q

general rules for errosion control plan

A
minimise disrupted area
divert clean flows around site
provide buffer to flows
reduce errosion (sloped )
restore cover
prevent stuff from exiting site
18
Q

tools for sediment and errosion control

A

recover as soonm as possible
silt fences
silt retention ponds

19
Q

what site characteristiucs do you need to list for design project

A

current run off areas

location of currfent wells etc
flood risks
catchment area