Steel Erection Flashcards
Keys to success
Success starts with bidding process
Fabrication Considerations
Economical Fabrication relies on production line approach
Regular nispection
Need confident experiences inspector
be aware of commercial standards
Keep adequate testing as per contract requirements
Ordering
Join from foundation to frame
Primary Protection Technique
Encapsulation in vapour proof membrane
Coating with sacrificial metal (galv)
Coating with sacrificial paint, overcoating with a protective paint
Secondary Protection Techniques
Provide Adjacent scrificial material of lower galvanic properties
INduce hard rust on surface to inhibit corrosion
Providing sufficient thickness of material to guarentee service life
Steel Storage
Store in single seperated layers
On an angle to reduce water sitting in beams
Store clear of ground
Sling Equalisiation
Critical to safe lifting
COG will always be directly below hook
Equalisation Equipment
Equaliser beams
Pulleys
Equalising Triangles
Synchronised Jacks
Erection Tasks
Secure Crane info
Check transport of materials
Decide laydown area
Determine crane size
Determine temporary restain systems
Determine parting area if needed
Crane Selection
Avoid Maerginal Situations
Consider crane movements in 3D
Understand characteristics of different types
Consider operating surface
Cautious of multi-crane lifts
Crane Size Considerations
Jb Lenghts
Max radius
Min radius
Jib angle @ min
Jib angle @max
Clash with existing steelwork
Max Load
Multi-Crane Lifts
Reduces ability
2 - 20% download
3 - 33% down rating
4 - 50% downrating
Multicrane Setup
Accidental lateral load on boom will result in a failure