SS Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

What must your erosion control plan adhere to?

A

2003 EPA Construction General Permit (or local standard, whichever more stringent)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is a Phase I Environmental Site Assessment? (ESA)

A

a report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Phase II Environmental Site Assessment more in depth?

A

A further investigation that collects original samples of soil, groundwater, or building material to analyze for contamination

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Define Development Footprint

A

The total land area of a project site covered by building, streets, parking area, and other typically impermeable surfaces constructed as part of the project

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is an example of a monoculture planing, which would not help with restoring/protecting habitat?

A

Turf Grass

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What areas can be excluded from the vegetation and soil requirement to restore / project habitat?

A

Vegetated landscape area that are constructed to accommodate rainwater infiltration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

For school projects, what areas can be excluded from soil restoration criteria to restore/protect habitat?

A

Athletic fields

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What amount of financial support can be provided to restore/protect habitat?

A

$0.4 / sf

$4 / m2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the distance limitations when providing financial support to protect/restore habitat?

A

Financial support must be provided to a nationally or locally recognized land trust or conservation organization within the same EPA Level III ecoregion or the project’s state( or within 100 miles of the project). For U.S. projects, the land trust must be accredited by the Land Trust Alliance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What should be included in a sustainable landscape plan?

A

List of all plant species, noting whether or not they are native/adapted; info about invasive species and pests those plans may harbor: best maintenance practices for the chosen plants, and site maps showing boundaries for the protected habitat area.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the IESNA lighting zones?

A
LZ0-Wilderness
LZ1-Dark (park, rural area)
LZ2- Low (residential, light industiral)
LZ3 - medium ( commercial, industiral, high density residential)
LZ4- High ( metro areas)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When an organization / agency is providing space for shared use to students, what should be included?

A

Auditorium, Gym, Cafeteria, One or more classrms, Swimming pool, or Playing field

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What slope is important for heat island effect - roof?

A

2: 12 slope > steeped slope and requires an initial SRI of 39 or greater
2: 12 <= means low slope and requires an SRI of 82 or greater

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What causes skyglow?

A

Stray light from unshielded light sources and light sources and light reflecting off surfaces that then enter the atmosphere and illuminate and reflect off dust, debris, and water vapor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

For schools to achieve Site Master Plan, how many other credits must be met/

A
At least 4 out of 6:
LT Hight priority site
SS Site Development - Protect or Restore Habitat
SS Open space
SS Rainwater management
SS Heat island Reduction
SS light Pollution reduction
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is Technical Release (TR 55?

A

an approach to hydrology in which watersheds are modeled to calculate storm runoff volume, peak rate of discharge, hydrographs, and storage volumes, developed b the former USDA Soil Conservation Service.

17
Q

What information must be inventoried for a site assessment?

A
Topography
Hydrology
Climate
Vegetation
Soils
Human use
Human health effects
18
Q

What is a three year aged SR(or SRI)?

A

A solar reflectance or solar reflectance index rating that is measured after three years of weather exposure

19
Q

What should be used to estimate the water storage capacity of a site during a site assessment?

A

Urban Hydrology for Small Watersheds Technical Release 55(TR 55) or local equivalent for project outside of the U.S.

20
Q

What percent of Open Space must be vegetated?

A

25 % min

21
Q

How much outdoor space must be provided for open space?

A

30% of the total site area(including the building footprint) or greater

22
Q

What must outdoor space be to qualify for Open space?

A

Physically accessible

23
Q

What types of outdoor spaces qualify for open space?

A
  • paving or turf that accommodates outdoor social activies
  • paving or turf that encourages physical activity
  • year-round garden space
  • community gardens
  • preserved or created habitat
24
Q

When can a vegetated roof count towards vegetation for open space?

A

When a project has a density of 1.5 FAR