Q

has a wide range of process because this is where planning usually takes. Gathering data

A

Pre- design services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Scope of pre-design services

A

• consultation
• pre- feasibility studies
• feasibility studies
• site selection and analysis
• Site utilization and land-use studies
• Architectural research
• Architectural programming
• Space planning
• Space management studies
• Value management
• Design brief preparation
• promotional services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

After the initial meeting, the architect must submit his proposal for pre-design services, stating the ff:

A
  • scope of work
  • manner of payment
  • owner’s responsibilities
  • other conditions of services
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Spp Doc 201

A

Pre-design Services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Spp doc 202

A

Regular design services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Design development duration and percent

A

3-4 months 15 %

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Pre-design duration and percent

A

1-2 months 5%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Schematic design duration and percent

A

2-3 months 10%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Construction documents duration and percent

A

5-6 months 25 %

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Construction administration duration and percent

A

18-24 months 45%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Architectural design process

A

• pre- design
• schematic design
• design development
• construction documents
• construction administration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Consult with the owner to ascertain the conceptual framework and related requirements of the project

A

Project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Gathers relevant information of data leading to the definition of the requirements of the project

A

Project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Reviews and refines the owner’s space requirements

A

Project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Prepares an initial statement of probable construction cost

A

Project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Evaluates the owner’s program, schedule, budget, project site

A

Schematic design phase

17
Q

Prepares the initial line drawings representing design studies leading to a recommended solution

A

Schematic design phase

18
Q

Submits to the owner a SPPCC based on current cost parameters

A

Schematic design phase

19
Q

The design development documents consisting of plans, elevations, sections and other drawings

A

Design development phase

20
Q

Outline specifications to fix and illustrate the size and character of the entire project as to type of materials, type of structural, electrical, mechanical, sanitary, electronic and communications systems

A

Design development phase

21
Q

Diagrammatic layout of construction systems

A

Design development phase

22
Q

An updated sppcc for submission to the owner

A

Design development phase

23
Q

Prepares the complete contract documents consisting of detailed designs and construction drawings

A

Contract document phase

24
Q

Prepares technical specifications describing type and quality of materials

A

Contract document phase

25
Q

Submits to the owner 7 sets of all construction drawings and technical specifications for purposes of obtaining building permit

A

Contract document phase

26
Q

Updates sppcc based on changes of scope, requirements or market conditions

A

Contract document phase

27
Q

Assist the owner in filing the required documents

A

Contract document phase