Specifications Flashcards
The ________ is responsible for writing the specifications so that they are consistent with the prints.
architect
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastics and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Conveying Systems
Division 00
Procurement and Contracting Requirements
Divisions 15 to 19
Unassigned
Division 20
Unassigned
Division 21
Fire Suppression
Division 22
Plumbing
Division 23
HVAC
Division 24
Unassigned
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 29
Unassigned
Division 30
Unassigned
Division 31
Earthwork
Division 32
Exterior Improvement
Division 33
Utilities
Division 34
Transportation
Division 35
Waterway and Marine Construction
Divisions 36 to 39
Unassigned
Division 40
Process Integration
Division 41
Material Processing and Handling Equipment
Division 42
Process Heating, Cooling and Drying Equipment
Division 43
Process Gas and Liquid Handling, Purification, and Storage Equipment
Division 44
Pollution Control Equipment
Division 45
Industry-Specific Manufacturing Equipment
Divisions 46 and 47
Unassigned
Division 48
Electrical Power Generation
Division 49
Unassigned
Each technical division covering an area of work should contain four parts as follows; ______, ________, _______ and ________.
Scope
Materials
Applications
Guarantee
In the event of any discrepancy or conflict between the prints and specifications, the _________ take precedence.
specifications