SOPs Flashcards
1
Q
Tracking tolerance/deviation (dots)
LOC/GS
A
CAT I/Ii/III. LOC 1 dot and GS 1dot
PM calls. LOC 1/2 dot GS 1/2 dot
2
Q
Tracking tolerance Final App
A
Lateral XTK 0.3 NM
Vdev 3/4 dot
PM calls XTK 0.1nn
Vdev 1/2 dot
3
Q
Tracking tolerances LOC FPA
A
LOC 1 dot
CDA-VDA
PM calls LOC 1/2 dot
Vertical n/a
4
Q
Tracking tolerance nav fpa
A
Lateral Xtk 0.3 nm
Descent profile
PM calls 0.1 nm
N/a
5
Q
SUPP fuel
A
Planned to arrive with 1800 kg at destination, if not, SUPP fuel will be added