SOP Flashcards
What is the minimum crew for APU ops
2
What are weather minimums for operations in October mountain training area?
Day: 2500-3 at BDL and PSF with a minimum area forecast of 2500-3.
NVG: 2500-3 at BDL and PSF with a minimum area forecast of 2500-3
What is the Navigation Training Altitude
500-1000’ AGL
What is our AAR requirement?
Completed By aircrew every flight. Initialed 5484, written AAR when required
What is the maximum amount of Flight time that can be flown during the day, before requiring an extension?
8 hours
What are the CBRNE training tasks for UH-60?
1024 Perform B4 Starting Engines thru B4 leaving helicopter 1026 Maintain Airspace Surveillance 1028 Perform Hover Power Check 1038 Perform Hovering Flight 1040 Perform VMC Take Off 1052 Perform VMC Flight Maneuvers 1058 Perform VMC Approach
Who is allowed to use Lasers?
NRCM / Door Gunner
When Must Crewmembers review their Aircrew information Reading file?
Before each flight
When operating in known noise sensitive areas, unless required by the mission, all Army aircraft should maintain a minimum altitude of?
2500’
How would you request non flight training?
Through the instructor
When is an aircraft considered overdue?
> 30 minutes past ETA or last contact time
VFR flight crews will return to BDL when the weather conditions at KBDL are reported below?
Day 600-2
Night 1000-3
NVG 600-2
What is the minimum crew required for NVG HH-60M sling load operations?
2 Pilots
1 CE/MO
What are the hoist currency requirements for RL1 aircrews?
5 Practice Lifts with a dummy weight at 100 AGL or more within 180 days. Or 1 Live lift every 180 Days. Most demanding mode of flight applies for currency.
Who would approve a Seats Out flight?
TAG
When will crewmembers be equipped with a survival radio?
Always, every flight
What is the maximum military duty day length in 24 hours before an extension is required?
16 hours
Under Sling load operations in the SOP how are the training loads marked?
“CTARNG” and weight marked on block
What is the minimum crew for D/N/NVG H-60 hoist operations?
Two pilots, a hoist operator (CE/MO) and a CE/MO, (second MO/CE can ride the hoist)
or
Two pilots, a hoist operator (CE/MO) Dummy Load Crew set
While towing an aircraft are people allowed to be inside the aircraft doing the aircraft logbook?
No
If water, sediment, or any other suspicious matter is found in a fuel sample, who will be consulted to verify the condition of the sample?
Technical Inspector
For aircraft lighting when will position lights be steady bright?
Night Unaided/NVG – Aircraft Moving
When performing multi aircraft operations how many rotor disks qualifies as “loose”?
6-10 discs
Flight crewmembers walking on the flight line at night are required to have a light on (flashlight or headlamp)?
True
What is the most current version date of the SOP?
30AUG17