Some Shit Flashcards
On the LAU-7 , what prevents movements and vibration of the missile
Aft snubbers
What provides an electrical path between the missile and the firing safety switch
Aft striker point
What is used to test the nitrogen flow rate of the launcher AIM-9 cooling system
GMU-24/A (rate of flow indicator)
What is used to leak test the launcher AIM-9 nitrogen cooling system
TTU-246/E (pressurized system leakage tester)
What performs a complete electrical test of launchers
A/E37T-35A CRALTS(Automatic/Semi-automatic)
What instruction is used for Non-Nuclear Ordnance Requirements (NNOR)
OPNAVINST 8011.9A
What are the three types of maintenance
O-Level
I-Level (directly supports it’s own activity)
Depot Level(overhaul)
If an attendant TD had not been issued within how many days do you contact NAVAIR
3 days
Where is NOLSC located
Mechanicsburg, PA