sog 4 RIT Flashcards
a RIT team will be established when
on any IDLH
when will a RIT be established and who will it consist of
as soon as possible, an engine company with a minimum of three personnel.
the IC will determine the number of RIT team based on what
the complexity of the incident and risk assessment of the operating teams
who will staff RIT
a minimum of one officer/step up and two firefighters will staff RIT
what is level 2 accountability
UIP placed on the designated tactical accountability/entry board
what is level 3 accountability
personnel that are making entry into the hazardous area are to remove a second PAT and attach it to the entry board with the accountability officer at the controlled entry point
the IC will brief the RIT officer on what information
radio operations channel, status and location of all assigned companies
the RIT officer will meet with the ISO (if possible) to conduct what
a size up and 360 degree of the survey of the structure/incident
the RIT officer will determine the staging area based on
360 survey, entry and egress hazards, fire and hot zone location, size, behavior, smoke and fire conditions, locations of firefighting/rescue operations, hazards in and around the fire ground, additional equipment or resources needed
the RIT will remain uncommitted until when
deployed, reassigned or released by IC
Only the _____ can deploy the RIT
IC
what is the primary responsibility of RIT
to find and remove the injured, lost or trapped firefighter