Smart Location And Linkage Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

A site whose future is affected by possible contamination is called a

A

Brownfield

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

SLL Credit 1 - Preferred Locations - encourages teams to develop within existing cities, suburbs, and towns to reduce adverse environmental and public health effects associated with sprawl. Which project location type will achieve the most points for this credit?

A

Locating on an infill site that is also previously developed - 5 points
Locating in an area with existing connectivity within 1/2 mike of project boundary of 400 or more intersections per square mile - 5 points
10 points total

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

2 species inside project boundary are threatened under the ESA. How do you comply with SLL prerequisite 2 - Imperiled Species and Ecological Communities Conservation?

A

Comply with an approved habitat conservation plan or equivalent, if the species is threatened, endangered, or GH, G1 or G2 by NatureServe

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A project has 1,200,000 sf of total nonresidential floor area and 350,000 sf of buildable land. What is the total nonresidential density, expressed as FAR?

A

Total nonresidential density = total nonresidential floor area sf / total nonresidential buildable land sf. 1,200,000/350,000 = 3.42 nonresidential buildable land.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The project site contains 10,000 sf of a previously developed area with slopes above 40%, 20,000 sf of previously developed area with slopes between 26% and 40%, and 50,000 sf of previously developed area with slopes between 15% and 25%. How much combined sloped area must be restored with native or adapted planting’s to meet SLL Credit 6 - Steep Slope Protection?

A

Slopes over 40% must be 100% restored (10,000sf)
Between 26-40% must be 60% restored (12,000sf)
Between 15-25% must be 40% restored (20,000sf)
= 42,000sf restored with native and adaptive planting’s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which locations would earn a project points for SLL Credit preferred locations?

A

Locate the project on an infill site that is not previously developed - this would earn points for option 1 of SLL Credit 1.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

A project for a previously developed site has a slope over 40% that will require 100% restoration to earn SLL Credit steep slope protection. What else will the project team need to do to earn the credit?

A

Develop covenants, conditions, and restrictions (CC&R) to protect the slope in perpetuity. Development is not permitted on slopes greater than 40%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A planned multi unit residential project will have 50 planned occupants living in 30 residential dwelling units. How many residential long-term bicycle parking spaces are needed to earn SLL Credit bicycle facilities?

A

Take the greater of the following: 30% of regular building occupants or 1 storage space per residential unit.
50*30% = 15 spaces
1 space per unit = 30 spaces

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A previously developed site has a slope over 15%. What must occur to protect the slope to earn SLL Credit steep slope protection?

A

Locate development such that the % of the development footprint that is on existing slopes less than 15% is greater than the % of buildable land that has existing slopes less than 15%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Impervious bike and per pathways

A

May be 12’ but only 8’ may be impervious

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How many intersections per square mile will earn a project SLL credit preferred locations?

A

200 - earns 1 point

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

SLL Credit five housing and jobs proximity: how many existing dwelling units must be located within half mile walk distance for option three?

A

50 percent of new jobs created

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the shortest time A management plan must be funded for SLL credit long-term conservation management of habitat for wetlands and water bodies?

A

10 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What requirements must be met to achieve SLL credit brownfield redevelopment?

A

Documenting any part of a project site as contaminated or As a Brownfield
Remediating contamination

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The vehicle miles traveled per capita must not exceed how much of the average of the metropolitan region to earn points under SLL credit access to quality transit?

A

90 percent must not be exceeded too earn 1 point

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What’s the minimum number of long-term bicycle storage space is required for workers in a retail project that will have planned occupancy?

A

Five percent of regular building occupants. No fewer than two storage spaces per building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What defines a floodplain for SLL pre-requisite floodplain avoidance?

A

Any areas noted on a legally adopted flood hazard map.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

How do buildings meet the storage and shower requirements for SL credit bicycle facilities?

A

90 percent of all new multi unit residential buildings and all new non-residential buildings must individually Meet the storage and shower requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

How many acres must patches of predominately native vegetation Be To qualify a significant habitat?

A

150 acres

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

When can intersections within a site be counted for connectivity forSL credit preferred locations?

A

Only when the intersections we’re not constructed or funded by the developer within the past 10 Years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

How close must diverse uses be to the project boundary to contribute towards a bicycle network?

A

3 miles biking distance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What type of plants can be used for restoration for SLL credit restoration of habitat or wetlands and water bodies?

A

Native plants only

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What is not considered a minor improvement within the 100 foot buffer of a water body for SLL prerequisite wet land and water body conservation?

A

Adding a 500 ft.² off street parking area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

A previously developed site has a slope over 15%. What must occur to protect the slope to earn SLL credit steep slope protection?

A

Locate development so that the percentage of the development footprint on existing slopes less than 15% is greater than the percentage of buildable land that has existing slopes less than 15%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

How many secure a bicycle storage spaces Are needed to earn SLL credit bicycles network and storage?

A

The greater of the following: 30% of planned multiunit occupants or the number of multiunit residential dwelling units

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Previously developed site has a slope of 20%. What must be done to earn SLL credit six steep slope protection?

A

Restore 40% of the slope area with native plants or non-native adapted plants. Restoration is required on previously developed slopes over 15%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Mitigation ratio

A

Area of easement per area of project on prime unique or significant farmland

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Which of the following smart location and linkage credits have exemplary performance?

A

Access to quality transit

Restoration of habitat or wetlands and water bodies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Which will not meet requirements of ongoing management activities for SLL credit restoration of habitat or wetlands and water bodies?

A

Earn SLL credit site design for habitat or wet land and water body conservation - does not meet the requirements of ongoing maintenance. Can help flag areas of concern however

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

A project is located near an existing bike network. How close must diverse uses be to the project foundry to contribute towards a bicycle network

A

Within 3 miles biking distance from the project boundary

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

What are the minimum aggregate daily weekday transit requirements for a project with multiple transit types in order to provide adequate transit service for SLL pre-requisite 1 smart location?

A

60 – for multiple transit types 60 is required

32
Q

Which is required for a project to earn SLL pre-requisite smart location

A

Locate the project on a site served by existing or planned water and wastewater infrastructure

33
Q

What potions of a site may be exempt from the requirements of SLL Credit steep slope protection?

A

Slopes less than 15%

34
Q

A residential building project will have new offstreet surface parking lots in the rear of buildings. There will be 320 total parking spaces and plan occupancy a 500 occupants. Which project feature is not required for SLL bicycle facilities?

A

Short term bike packing

35
Q

A project has internal streets. What portions of the circulation network are included in the connectivity calculations?

A

Gated health care campus

Gated residencies cannot be included in calculations and should not comprise more than 10% of the total project area

36
Q

What does not qualify as significant habitat for SLL credit site design for habitat or wetland and water body conservation

A

Patches of predominantly native vegetation at least 100 acres
Only counts if at least 150 acres

37
Q

What requirements must be met to achieve SLL credit brownfield redevelopment?

A

Documenting any part of a project site as contaminated or as a Brownfield
And remediating contamination

38
Q

A project’s development footprint affects land with prime soils. The project will mitigate the loss through the purchase of easements to satisfy the requirements of SLL prerequisite agricultural land conservation. What is true of the mitigation?

A

The upside mitigation must be located within 100 miles of the project

39
Q

Hey!

A

You got this!!! 😻

40
Q

A 100 acre mixed-use project is multi unit residential and retail. What will be needed to earn SLL credit bicycle facilities?

A

2 short term bicycle spaces for every 5000 square-foot retail
One secure space per 10 dwelling units no less than four per project site.

41
Q

Project is defining a 100 foot buffer around a significant habitat. What functions does the buffer serve?

A

Bio diverse city

Hydrology

42
Q

A project is near existing transit service. What minimum densities must the project be built to if the residential and nonresidential components are located within walking distance of the transit?

A

12 or greater dwelling units per acre of land for residential
.8 floor area ratio or greater for non-residential

43
Q

What locations cannot earn a project points for SLL credit preferred locations?

A

Locate a project on a site that does not contain any land within a 100 year moderate risk floodplain as defined by FEMA

This is for SLL prerequisite five floodplain avoidance

44
Q

Which project designs do not meet the requirements of a bicycle network for a 100% residential project

A

Providing one secure enclose bike storage space per occupant for 30% of the planned occupancy
This is for storage not network silly!!

45
Q

If a project mitigates the loss of soil through the purchase of offsite easements what must the mitigation ratios be based on?

A

Densities per acre of buildable land

46
Q

What statement is not true regarding SLL credit access to quality transit

A

Additional points can be earned for this option if the location has low VMT
(Removed in v4)

47
Q

Under option five site with impacted soil’s for SLP requisite agricultural land conservation, what is true about exempting affected soil’s from the density requirements

A

Up to 15% of affected soils permanently designated for community gardens can be exempted and counted towards mitigation

48
Q

What functions of a wetland would a qualified biologist not need to determine for the wetland for SLL credit site design for habitat or wetland and water body conservation

A

Elevation of slopes around the wetland

49
Q

Which of the following options is available only to projects with a residential component equaling at least 30% of the total building square footage for SLL pre-requisite smart location

A

Sites with nearby neighborhood assets

50
Q

A project has 100 acres of prime soil for agriculture and a patch of native vegetation of 200 acres. What must occur for the project to earn SLL credit site design for habitat or wetland and water body conservation

A

The 200 acres of native vegetation must be maintained in Pre project condition or better for at least three years after the project is built out

51
Q

SLL credit access to quality transit percentage requirement

A

50% of non-residential use entrances must be within 1/4 mile walking distance of bus/streetcar stop or 1/2 mile of bus rapid transit light rail heavy rail commuter rail ferry Kerry etc.

52
Q

Which project meets the requirements of SLL pre-requisite smart location

A

A project with nine diverse uses within 1/2 mile of the project center

53
Q

A site was found to have an imperiled species listed in the national heritage program. Which of the following is not part of a conservation plan that a qualified biologist would need to create

A

Create and implement a ten-year management plan to protect the species
This is required for SLL credit long-term conservation and management of habitat or wetlands and water bodies

54
Q

Multi unit residential visitor bicycle parking spaces

A
The greater of the following:
2.5% of all peak visitors
Or
4 spaces
No fewer than four spaces per building
55
Q

Which is required for a project to earn SLL pre-requisite smart location

A

Locate the project on a site survey existing or planned water and wastewater infrastructure - Must be in place or planned

56
Q

What can a 10 acre project located within a region served by a Metropolitan planning organization do to earn SLL credit access to quality transit

A

Locate the project on a site with existing transit service such that at least 50% of dwelling units are within 1/2 mile of public rail line

57
Q

What is not part of the management plan for SLL credit long-term conservation and management of habitat for wetlands and water bodies

A

Brownfield monitoring if the site is a brownfield or contaminated

58
Q

What minimum percent of dwelling units are non-residential building entrances must be near transit service for SLL credit access to quality transit

A

50%!!!

59
Q

What does not qualify as a significant habitat for SLL credit site design for habitat or wet land and water body conservation

A

Habitat for species located within 50 feet of wetlands on site
The 50 foot buffer is for wetlands. this is not related to habitat preservation

60
Q

Long term bicycle storage for non-residential

A

5% of regular building occupants but no fewer than two storage spaces per building in addition to the short term bike storage

61
Q

Short term bicycle facilities for residence and employees must include which of the following features to qualify for SLL credit bicycle facilities

A

The project and we must be no more than 1/4 mile from an existing bicycle network or at least 50% of residential and nonresidential entrances must be located on a bicycle network that connects to at least 10 diverse uses

62
Q

Short term bicycle storage

A

Must be within 100 feet (30m) of the main entrance

63
Q

Covenants conditions and restrictions

A

Limitations that may be placed on a property and its use and I made a condition of holding title or lease

64
Q

How many existing full-time equivalent jobs must be located within half mile walk distance for the project to earn SLL credit housing and jobs proximity

A

For option one and option two the number of jobs must be greater than or equal to the number of dwelling units

65
Q

In addition to locating a project in a high-priority redevelopment area, part of what other credit must be earned to achieve SLL credit preferred locations?

A

NPD credit housing types and affordability

66
Q

A project development footprint affects land with prime soil‘s. The project will mitigate the loss through the purchase of easements to satisfy the requirements of SLL pre-requisite agricultural land conservation. How can the project exam to 15% of the impacted soil’s from the density requirements?

A

Permanently dedicate exempted area as a community garden

67
Q

What amount of area must be restored with native plants to earn SLL credit restoration of habitat or wetlands and water bodies

A

10% of the development footprint

68
Q

Where must existing full-time equivalent job to be located to count towards SLL credit housing jobs in proximity for sites larger than 500 acres?

A

Within half mile walking distance of the project boundary

For projects 500 acres or more the measurement of jobs is taken from the project boundary

69
Q

What must be included in a management plan for SLL credit long-term conservation and management of habitat for wetlands and water bodies

A

Biological monitoring overtime

Procedures for maintaining the conservation areas

70
Q

A 400 acre project has an affordable residential component. Where must existing full-time equivalent jobs be located to count towards SLL credit housing jobs in proximity

A

Within half mile walking distance from the geographic center of the project
The projects 500 acres or less the measurement of jobs is taken from the geographic center

71
Q

Management best practices for SLL credit long-term conservation and management of habitat for wetlands and water bodies recommends frequent site visits during what phase?

A

During the first two years

72
Q

A project will earn SLL credit preferred locations. What additional credits could this help earn

A

SLL credit housing and jobs proximity
GIP credit rain water management
NPD credit connected and open community

73
Q

A previously developed site has a slope of 20%. What must be done to earn SLL credit 6 steep slope protection?

A

Restore 40% of the slope area with native plants or non-native adapted plants

74
Q

A 1000 acre project will include a residential component. Where must existing full-time equivalent jobs be located to count towards SLL credit housing jobs in proximity

A

Within half mile walking distance of the project boundary

Projects 500 acres or more - The measurement for jobs taken from the project boundary

75
Q

Which different project locations with meet the requirements for adequate transit service for SLL prerequisite one smart location

A

A site within 1/4 mile walking distance of a bus or within 1/2 mile walking distance of the subway
A site within 1/4 mile walking distance of the ferry

76
Q

Part of what other credit must be earned to achieve SLL credit preferred locations

A

NPD credit housing types and affordability