Q

Good grounding in a substation yard is essential in order for relays to be activated to open switchgears during ground faults.

A

true

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The ideal location for a substation is ? , but out of public view.

A

close to the load center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When an engineer plans for stormwater drainage or the flow of oil released accidentally, he or she will refer to a ? map.

A

topographical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Soil resistivity is a factor in site selection because soil with a high resistance may require compensation measures so that the ?

A

ground grid operates properly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Fill areas should be compacted in eight-inch layers to ? of the maximum density as mandated by ASSHTO Standard T180.

A

95%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The definition of the term soil ? is to mechanically increase the density of the soil.

A

compaction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Increasing soil density by putting particles in motion and moving them closer together is the ? method.

A

vibration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The four types of compaction are further divided into two basic types. These basic types are the ? type and the vibratory type.

A

static

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

In soil with too much moisture, the particles cannot move past each other, resulting in inadequate compaction.

A

false

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Rammers cover three types of compaction and operate within a range of ? blows per minute.

A

500 to 750

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A soil type with cohesive properties is ?

A

clay