equipment foundations Flashcards
The two most common types of foundations used in substations and switchyards are drilled shafts and ?
slabs on grade
The specification that covers zinc coatings applied by the hot-dip process to steel hardware is the ? standard.
ASTM a153
A cost-effective foundation requiring less excavation and backfilling, and little or no forming, is the ? type.
auger drilled pier
If a casing is used when pouring a foundation, it is not removed until the concrete has set for 24 to 48 hours.
false
Reinforcing steel (rebar) comes in ?
grade 40,50,60
After adding the mixing water, concrete should be poured within ? . Concrete that has begun to set should be rejected.
1 1/2 hrs
The steel used to manufacture rebar can be billet-steel, rail-steel, or ?
axel steel
After completion of the concrete pour and vibration, the next step is to ?
recheck the anchor bolts for location and alignment
A properly built transformer or oil switch foundation must be capable of withstanding compression and ? loads.
overturning
When hydraulic jacks are used to raise and level the main power transformer on a slab, point loads or ? loads are generated.
compression
If water cannot be removed or if the concrete is to be dropped vertically more than six feet, the use of a ? may be implemented. This is the preferred method of pouring a drilled pier.
tremie pie
The use of ? conduit or hardware in a concrete foundation must be avoided.
aluminum
Templates are used to accurately locate anchor bolts. The acceptable positioning tolerance is within ?
1/16 ‘’