SF TACFAC Flashcards

1
Q

What are some of the major things pre-deployment plans used in preparation for a TACFAC?

A

MDMP, SOR, area study, site survey, area assessment, SOP debrief and retrieval system (SODARS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is a Critical Nodes Matrix (SWEAT-MSS)?

A

It’s a planning guide to provide a start point to establish a TACFAC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are some aspects of the initial phase?

A
  • Major concerns are basic survival needs and security
  • low standard of living
  • basic protective measures implemented
  • inital facilities will either be abandoned or transitioned into the nest phase
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are some of the aspects of the temporary phase?

A
  • New buildings are constructed
  • potable water, HVAC, outhouses, and most buildings should be wired
  • improved security and defense/fighting positions
  • earthen berms and barriers
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What’s a permanent phase look like?

A
  • Has enclosed building complex
  • incorporates PACE plan for water, electric, medical treatment, commo, personnel security, secure ammo and fuel storage
  • improved security
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What’s the heart of the TACFAC?

A

The inner perimeter, includes operational admin and logistics

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does the outer perimeter contain?

A

-most Host nation forces

Layers of defense positions, buildings and typically a 25m small arms range

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What area is required during the initial phase?

A

Admin area, so that you can meet with host Nation personnel or tribal leaders without risk of compromising sensitive info in the inner perimeter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What’s a relief in place (RIP)?

A
  • Relieving an established team
  • that team needs to conduct 100% TACFAC inventory before new teams arrival
  • provide checklist of state of TACFAC and items that need addressing, and info on projects and outstanding contracts
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are some characteristics of the HLZ needed in the inner perimeter?

A

Needs to be a size 4 to be able to fit a Chinook helicopter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly