Sewers & Septic Systems Flashcards
What is the typical grade for the inlet and outlet of septic tanks?
inlet/influent -> 1/4” per foot
outlet/effluent -> 1/8” per foot
When a pipe trench soil is hard pan or unyielding in general, the trench should be overexcavated approximately how many inches?
4 inches
What tests can be used on sanitary and storm sewer lines?
infiltration and exfiltration
What is the minimum septic tank cover for average and cold climates?
a minimum 1 foot cover in average climates or 2 feet in cold climates
When the septic tank is above the leach field, the leader to leach lines is run at what down angle?
45 degrees
A minimum septic tank size is approximately how many gallons?
1,000 gallons
There should not be more than how many feet of open trench in which the line has not been completed?
200 feet for sanitary and sewer
Ditch bottoms for storm drainage systems should measure how wide?
8 feet
What is a combination of both tank and a drain field?
Cesspool
Exfiltration tests for storm drains shall indicate leakage of no more than ___ gal/hr per inch of diameter per 100 feet of pipe.
1.0 gal/hr
A natural drainage course is referred to as a?
Swale
What allows the soil to drain between applications?
Periodic dosing of large volumes of effluent improves dain field performance
What is a liquid limit?
Is the water content expressed as a percentage of the dry weight at which the soil will start to flow when testing by the shake method.
The compartments of a three compartment tank are divided on the basis of what ratio?
2:1:1
Upon approval of local authorities, the tank size and its associated leach field maybe reduced without reducing efficiency or safety by?
Segregating water flows
The septic tank must be large enough to hold how many days of sewage?
3 - 5 days
What is the plastic limit?
Is the percentage of moisture content at which the soil begins to crumble when it is rolled into a thread.
When setting the tank, what must be observed?
Be sure that the inlet and oulet match-up with their corresponding pipelines.
When plastic drain pipe is solvent welded, backfilling shoud be delayed approximately how many minutes to allow the cement to take initial set?
5 minutes
How much lower than the frost line should pipe be set in a ditch?
2 feet
If a polyethylene sleeve is used over ductile iron pipe, it should be taped or strapped at what intervals?
Every 2’ - minimize space between wrap and pipe
The time it takes to cut ductile iron pipe with a cut off saw is?
1 inch per minute
A two compartment tank is divided based on why fraction?
First Chamber = 2/3L
Second Chamber = 1/3L
The septic tank sewage treatment must retain the effluent in the septic tank for at least how many hours?
30