The process of mining any
near-surface deposit using a surface pit excavated using one or more horizontal
benches
Open-pit Mining
A horizontal slice of an open pit which is mined
as a unit
Bench
Collect sliding
material and stop downward movement of large
rocks
Safety (Catch) Benches
Where unit operations
(drilling, blasting, loading, and hauling) are
performed
Working Benches
Horizontal surface of the bench
Bench Floor
Vertical surface of the bench
Bench Face
The distance between the crest and the two
measured along the upper surface
Bench Width
The horizontal projection of the bench face
Bank Width
Vertical distance between upper and lower
bench surface
Bench Height
Interior vertex formed by the intersection of the
bench face and bench floor
Toe
Exterior vertex formed by the intersection of the
bench face and bench floor
Crest
The average angle the face makes with the
horizontal
Face Angle (α)
The angle measured from the bottom of the
bench toe to the top of the bench crest
Ultimate Pit Slope Angle
A pile of broken material constructed along the
crest to form a “guard rail”
Safety Berm
Added to pit walls to provide access between
benches and plant next to pit; 15% gradient
Haul Road
In-pit water is collected and pumped out of the pit
Sump
Nature of overburden where breakage not required
Unconsolidated
Nature of overburden where breakage is required
Consolidated
Type of drilling used for weak rocks
Auger
Type of drilling used for intermediate rocks
Roller Bit
Drilling type used for very hard rocks
Percussion
Chemical used in blasting along with the loading of machine and firing of electricity
Ammonium nitrate fuel oil
Most effective blast hole drilling pattern
Staggered
It is the transport of run-of-mine (ROM) ore to the processing area and removes overburden and waste rocks from the mine site
Hauling