Section 3 Flashcards

1
Q

What does SOC stand for?

A

System operation center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The SOC is responsible for directing all switching on the transmission system

A

True 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The SOC is responsible for keeping records of transmission switching

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The SOC is responsible for coordinating the scheduling of transmission switching 

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The manager of transmission system operations is not responsible for the approval of all submitted request for the clearance forms

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The manager of TSO trains, the operators on changes to the procedures that will be performed

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does DDC stand for?

A

Distribution dispatch center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The appropriate DDC is not responsible for any of the switching on the distribution system

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The DDC shall notify the SOC if the switching on the distribution system might affect the transmission system

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The DDC is responsible for keeping records of the distribution and transmission switching performed by them

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

All pre-arranged distribution outage request shall be made and coordinated through the appropriate DDC or local dispatcher

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Define request for distribution clearance forms are approved by the what manager

A

DDC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The what provides the training for any changes in the distribution switching procedures

A

DDC manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Who the who is the person in whose name the clearances placed?

A

Held for

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The who is the qualified person involved in the physical switching

A

Switch person

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Who is accountable for the pre-coordination of the project and has overall responsibility for the project

A

Responsible person

17
Q

Which of the following is an example of a responsible person?

A

Project managers, substation, electricians and journeyman lineman

18
Q

It is not necessary for everybody involved in switching sequences to review the switching orders

19
Q

Changes from the written procedures should be kept to a minimum to avoid switching errors

20
Q

In a emergency situation switching is allowed without a pre-arrange switching sequence

21
Q

The telephone should be used when communicating switching orders

22
Q

All order should be repeated by the receiver to be sure the message is clear

23
Q

It is not necessary to notify anybody when remotely operating a device

24
Q

Hold cards should be easily removed from the device that you don’t want operated

25
It is OK to work on equipment, even if you cannot see a visible opening
False
26
A hold card is a physical card, placed for a visually open device to provide clearance for personnel
True
27
A caution card is a physical card placed for a device indicating information instruction, or non-clearance warnings
True
28
During hotline work, caution cards shall be used to let the lineman know it is OK to energize at any time
False
29
The information tag is for the distribution dispatcher
True
30
The inhibit tag is for SCADA Controlled devices
True