Section 1: Sampling Fresh Concrete Flashcards

1
Q

What must occur before a sample of concrete can be taken from a revolving drum mixer?

A

All water and admixtures must be added to the mixer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When sampling from a stationary or a revolving drum mixer, what is collected and when is taken during discharge?

A
  • Two or more portions of concrete
  • Regularly spaced intervals
  • Middle of Batch
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How are the sample portions obtained from the discharge stream of a stationary or revolving drum mixer?

A
  • Repeatedly pass a receptacle through the entire discharge stream
  • Completely divert the discharge stream into a sample container
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Describe the procedure for collection a sample from a paving mixer

A
  • Discharge the contents of the paving mixer
  • Obtain samples from at least five different portions of the pile
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the minimum size for a sample when strength test specimens are to be molded?

A

1 cubic foot [28 L]

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the maximum allowable time between obtaining the first and final portions of the composite sample?

A

15 min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What action is required after the individual concrete samples have been transported to the place where tests are to be performed?

A

Combine and remix the samples with a shovel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What should be done if the concrete contains aggregate larger than is appropriate for the size of the molds or equipment being used?

A

Wet sieving (screening)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Slump, temperature, and air content tests must be started within how many minutes after obtaining the final portion of the composite sample?

A

5 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Molds for Strength tests must be started within how many minutes after fabricating the composite sample?

A

15 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

From what must the concrete sample be protected from?

A

Sun, Wind, Rapid Evaporation, and Contamination

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What types of equipment does this cover sampling from?

A
  • Stationary mixers
  • Paving Mixers
  • Revolving Truck Mixers
  • Continuous Mixers
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When sampling from a paving mixer, obtain samples from how portions of the pile must be sampled?

A

5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly