section 08 (quiz & script sheets & exercise videos) Flashcards
List the partial steps of sub-basin creation.
L8-1
- Digital Terrain Model
- Flow Direction
- Flow Accumulation
- water network
- Sub-basins
Is the following statement correct?
“For the calculation of a basin you use the initial DEM for all calculation steps.
(L8-2)
WRONG
List 3 tools that are part of hydrology modelling.
L8-3
Watershed
Fill
Flow Accumulation
Is the following statement correct?
“We have to fill sinks, because we do not want to consider lakes or ponds in our calculations.”
(L8-4)
WRONG
Is the following statement correct?
“According to the method of Strahler, the stream order only increases when two streams of the same order intersect.”
(L8-5)
TRUE
Is the following statement correct?
“If a stream of order 4 and a stream of order 2 intersect,
which stream order does the resulting stream have
according to Shreve?
(L8-6)
6
The Rhine Basin consists of how many major subbasins?
L8-7
10
NOT nine
How many possible directions do exist when calculating the flow direction of water in a grid?
(L8-8)
8
When calculating the flow direction of water in a grid, there are eight possible directions.
What is the Pour Point?
L8-9
the Pour Point:
the point on the surface where water flows out of the area
Is the following statement correct?
“Pour points can easily be calculated with the “pour point” tool.”
(L8-10)
WRONG