SCWS Study Flashcards
12 Steps to plan a patrol
- Study the mission.
- Plan use of time.
- Study terrain and situation.
- Organize patrol.
- Select personnel, weapons, and equipment.
- Issue WARNO.
- Coordinate.
- Make recon.
- Complete plan.
- Issue order.
- Supervise.
- Execute.
Purpose of USN (4)
Freedom of the seas.
Deterrence.
Forward presence.
Power projection.
4 Qualities that represent the navy
Readiness
Flexibility
Self Sustainability
Mobility
6 Areas of naval doctrine
Naval Command and Control Naval Operations Naval Warfare Naval Logistics Naval Intelligence Naval Planning
7 Principles of the Navy
Responsiveness Simplicity Flexibility Economy Attainability Sustainability Suvrivability
CESE
Organizational Maintenance Levels
- Operator Maintenance
- Planned Maintenance
- Corrective Maintenance
- Depot Maintenance
3 COMSEC Incidents
3 Supersessions
- Physical
- Cryptographic
- Personnel
- Regular normal scheduled.
- Irregular not scheduled
- Emergency (unplanned/compromised)
JOPES
Joint Operation Planning Execution System
COSAL
MOV
Consolidated Shipboard/Shore Allowance List
Material Obligation Validation
Wire Gear
CIS
TDN
AN/GRA-39
Comm and Info Security
Tactical Data Network
JCAVS
Joint Clearance and Access Verification System
TCMS
Theater
Construction
Management
System
DTD
Detailed Troop Decon
DED
Decon Process
Detailed Equipment Decon
Staging - 300m - Primary wash - 50m - Interior Decon - 50m - Rinse - 50m - Inspection
JCAD
CBR MARKERS
Chemical
Biological
Radiological
Yellow triangle, red lettering “GAS”
Blue triangle, red lettering “BIO”
White triangle, black lettering “ATOM”
SPOT report
Situation
Position
Observation
TIme
Seabees in WWII
Built 300 advanced bases
Seabees in Korea
Built Yo Do Airstrip in 16 days instead of 35 with artillery strikes.
Seabees in Vietnam
All 21 battalions deployed. Built some cool stuff.
Types of bridges
Baily
Medium Girder
Maybey Johnson
DRAW-D
Defend Reinforce Attack Withdraw Delay
METTT
Mission Enemy Terrain and weather Troops Time
MTVR
Medium
Tactical
Vehicle
Replacement
T R A V L R
Time Convoy is departing Reason for the convoy Area of location from Vehicle numbers/personnel Location to Routes taken to
MOCC Process
Dispatch Collateral Fuel/Defuel wash rack CM Shop Re-wash Final inspection Mobile Load weight and balance Hazmat Cert Load Planning Stage and chalk
MOS
DAT
FFM
AM2
Minimal Operating Strip
Damage assessment team
Folding fiberglass matting
Aluminum matting