S-13 Summary of Tasks Of Inspection, Testing & Maintenance Flashcards
1
Q
Gauges:
- On dry, pre-action and deluge systems shall be inspected ______________ to ensure that normal air and water pressure is maintained.
- where air pressure supervision is connected to a constantly attended location shall be inspected ______________
-on wet pipe sprinkler systems shall be inspected ____________ to ensure good condition & that normal water supply pressure are being maintained.
A
1 weekly
2 monthly
3 monthly